Europe: new lifts 2017/2018
All new lifts in Europe for the 2017/2018 - season - new lifts at ski resorts in Europe : renewal of ski lifts or ski resort expansions in Europe
Overview: new ski lifts in Europe 2017/2018
Add lifts and cable cars? Please report here
Europe: new ski lifts 2017/2018
- Europe – limit to
Countries: Austria (34), France (29), Italy (25), Switzerland (21), Russia (13), Czech Republic (10), Poland (7), Germany (6), Norway (5), Bosnia and Herzegovina (5), Sweden (4), Netherlands (2), Hungary (2), Andorra (2), Finland (1), Spain (1), Estonia (1)
Mountain ranges: Alps (98), Sudetes (Sudety) (9), Carpathian Mountains (Karpaty) (6), Scandinavian Mountains (Scandes) (6), Dinaric Alps (5), Apennine Mountains (Appennini) (4), Pyrenees (4), Central Uplands of Germany (Deutsche Mittelgebirge) (3), Bohemian Forest (Šumava) (2), French Massif Central (2)
Subcontinents according to UN definition : Western Europe (88), Southern Europe (31), Eastern Europe (28), Northern Europe (11)
Other: European Union (120), Central Europe (79), Scandinavia (10), Southeastern Europe (Balkans) (5), Benelux Union (2), Baltic states (1)
Piz Setëur I (YOC 2017)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 970 m · Carrying capacity/hour: 3600
Manufacturer: LEITNER
Details
Moraine (YOC 2017)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 2450 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Details
Gütsch-Express 1 (Andermatt–Nätschen) (YOC 2017)
8pers. Gondola lift (monocable circulating ropeway)Length: 1080 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Details
Gütsch-Express 2 (Nätschen-Gütsch) (YOC 2017)
8pers. Gondola lift (monocable circulating ropeway)Length: 1902 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Details
Alba-Ciampac (YOC 2017)
10pers. Gondola lift (monocable circulating ropeway)Length: 1933 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Fodom (Vauz-Pordoi) (YOC 2017)
10pers. Gondola lift (monocable circulating ropeway)Length: 2265 m · Carrying capacity/hour: 3200
Manufacturer: LEITNER
Details