All lifts/cable cars Mayrhofen – Penken/Ahorn/Rastkogel/Eggalm
Modern gondola lifts and the 3-S Penkenbahn lift transport skiers and snowboarders up to the ski resort. Up there, they can find mainly state-of-the-art high speed chairlifts (most with weather-protection covers). The Penkenbahn combined lift is a worldwide innovation with 2 lift stations: 10-person gondolas and 8-person chairlifts on one cable with separate lift stations allows winter sports enthusiasts to choose either quick boarding with attached equipment or a comfortable ride up on the gondola. Many moving carpets and practice lifts are available for beginners.
Number of ski lifts |
|
Total capacity | 93171 Passengers/hour |
Total lift length | 45.3 km Total |
Interconnection information
The slopes at the Penken, Horberg, Rastkogel and Eggalm are directly connected to each other. The entry points are in Mayrhofen, Finkenberg, Stockach (Schwendau), Hochschwendberg (Hippach), Lanersbach (Tux) and Vorderlanersbach (Tux). The Ahorn mountain in Mayrhofen is separate and the entry point is via a path which is around 400 metres from the Penkenbahn lift station. The entire ski resort, along with the Hintertux Glacier, is part of the Ski- & Gletscherwelt Zillertal 3000 (Ski & Glacier World Zillertal 3000).
Connected ski resort Mayrhofen – Ahorn
Number of ski lifts: 8
Connected ski resort Mayrhofen – Penken/Rastkogel/Eggalm
Number of ski lifts: 50
List of all current ski lifts
Ahornbahn (YOC 2006)
160pers. Aerial tramway/Reversible ropewayLength: 3045 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
150er Tux/Pendelbahn Wanglspitz (YOC 2001)
150pers. Aerial tramway/Reversible ropewayLength: 1800 m · Carrying capacity/hour: 1750
Manufacturer: Doppelmayr
Details
Penkenbahn (YOC 2015)
32pers. Tricable ropewayLength: 2903 m · Carrying capacity/hour: 3840
Manufacturer: Doppelmayr
Details
Finkenberger Almbahn 1 (YOC 2017)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 1780 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Möslbahn (YOC 2018)
10pers. Gondola lift (monocable circulating ropeway)Length: 1660 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Finkenberger Almbahn 2 (YOC 2003)
8pers. Gondola lift (monocable circulating ropeway)Length: 860 m · Carrying capacity/hour: 2880
Manufacturer: Doppelmayr
Details
Horbergbahn (YOC 2000)
8pers. Gondola lift (monocable circulating ropeway)Length: 3850 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
Details
Eggalm (YOC 1993)
4pers. Gondola lift (monocable circulating ropeway)Length: 1554 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
Details
Rastkogelbahn (YOC 1990)
4pers. Gondola lift (monocable circulating ropeway)Length: 2295 m · Carrying capacity/hour: 1300
Manufacturer: Doppelmayr
Details
Kombibahn Penken (YOC 2010)
Combined installation (8 pers. chair and 10 pers. gondola)Length: 831 m · Carrying capacity/hour: 3900
Manufacturer: Doppelmayr
Details
Horbergjoch (YOC 2002)
8pers. High speed chairlift (detachable) with bubbleLength: 1617 m · Carrying capacity/hour: 4000
Manufacturer: Doppelmayr
Details
Ahorn (YOC 2007)
8pers. High speed chairlift (detachable)Length: 700 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Tappenalm (YOC 2003)
8pers. High speed chairlift (detachable)Length: 614 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
Ebenwald (YOC 2013)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1244 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Lämmerbichl (YOC 2013)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1564 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Details
Katzenmoosbahn (YOC 2011)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1540 m · Carrying capacity/hour: 2800
Manufacturer: LEITNER
Details
Lattenalm (YOC 2009)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1094 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Eggalm Nord (YOC 2004)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1905 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Gerent (YOC 2005)
6pers. High speed chairlift (detachable) with bubbleLength: 1708 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Knorren (YOC 2003)
6pers. High speed chairlift (detachable) with bubbleLength: 1037 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Wanglspitz (YOC 2001)
6pers. High speed chairlift (detachable) with bubbleLength: 921 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Schneekarbahn (YOC 2001)
6pers. High speed chairlift (detachable) with bubbleLength: 1540 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Details
Unterbergalmbahn (YOC 2001)
6pers. High speed chairlift (detachable) with bubbleLength: 870 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Penken Express (YOC 1998)
6pers. High speed chairlift (detachable)Length: 1060 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Nordhang (YOC 1995)
4pers. High speed chairlift (detachable) with bubbleLength: 1114 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Sun-Jet (YOC 1997)
4pers. High speed chairlift (detachable)Length: 482 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Lärchwald (YOC 1991)
4pers. High speed chairlift (detachable)Length: 1100 m · Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
Details
Babylift Penken (YOC 2001)
T-barLength: 145 m · Carrying capacity/hour: 500
Manufacturer: Doppelmayr
Details
Mittertrett (YOC 1987)
T-barLength: 290 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Beilspitz (YOC 1979)
T-barLength: 786 m · Carrying capacity/hour: 1112
Manufacturer: Doppelmayr
Details
Hasenmuldenlift II (YOC 1978)
T-barLength: 420 m · Carrying capacity/hour: 980
Manufacturer: LEITNER
Details
Filzenlift (YOC 1969)
T-barLength: 350 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Details
Lämmerbichl (YOC 2013)
J-barLength: 288 m · Carrying capacity/hour: 718
Manufacturer: Doppelmayr
Details
Filzenalm (YOC 1987)
J-barLength: 390 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr
Details
Übungslift Ahorn (YOC 1978)
J-barLength: 190 m · Carrying capacity/hour: 700
Manufacturer: Doppelmayr
Details
Penkenkuli (YOC 1973)
J-barLength: 180 m · Carrying capacity/hour: 850
Manufacturer: Doppelmayr
Details
Hasenmuldenlift I (YOC 1969)
J-barLength: 405 m · Carrying capacity/hour: 740
Manufacturer: LEITNER
Details
Übungsland Penken 1 (YOC 2014)
Rope tow/baby lift with low rope towLength: 110 m · Carrying capacity/hour: 720
Manufacturer: Sunkid
Details
Übungsland Penken 2 (YOC 2014)
Rope tow/baby lift with low rope towLength: 104 m · Carrying capacity/hour: 720
Manufacturer: Sunkid
Details
Kinderland Horberg (YOC 2010)
Rope tow/baby lift with low rope towLength: 107 m · Carrying capacity/hour: 705
Manufacturer: Sunkid
Details
Übungsland Lämmerbichl (YOC 1994)
Rope tow/baby lift with low rope towLength: 120 m · Carrying capacity/hour: 600
Manufacturer: Bruckschlögl
Details
Minilift/Zubringer 150er
Rope tow/baby lift with low rope towLength: 115 m · Carrying capacity/hour: 408
Details
Babylift Penkenjoch
Rope tow/baby lift with low rope towLength: 100 m · Carrying capacity/hour: 510
Details
Übungsland Mösl
Rope tow/baby lift with low rope towCarrying capacity/hour: 500
Manufacturer: Sunkid
Details
Horberg Shuttle 1
People mover/Moving Carpet with coverCarrying capacity/hour: 710
Manufacturer: Sunkid
Details
Horberg Shuttle 2
People mover/Moving Carpet with coverCarrying capacity/hour: 710
Manufacturer: Sunkid
Details
Horberg Shuttle 3
People mover/Moving Carpet with coverCarrying capacity/hour: 710
Manufacturer: Sunkid
Details
Übungsland Eggalm 1
People mover/Moving CarpetLength: 40 m · Carrying capacity/hour: 710
Manufacturer: Sunkid
Details
Übungsland Eggalm 2
People mover/Moving CarpetCarrying capacity/hour: 710
Manufacturer: Sunkid
Details
Übungsland Ahorn 1
People mover/Moving CarpetLength: 138 m · Carrying capacity/hour: 710
Manufacturer: Sunkid
Details
Übungsland Ahorn 2
People mover/Moving CarpetLength: 12 m · Carrying capacity/hour: 710
Manufacturer: Sunkid
Details
Übungsland Penken 1
People mover/Moving CarpetCarrying capacity/hour: 710
Manufacturer: Sunkid
Details
Übungsland Penken 2
People mover/Moving CarpetCarrying capacity/hour: 710
Manufacturer: Sunkid
Details
Übungsland Lärchwald
People mover/Moving CarpetCarrying capacity/hour: 710
Manufacturer: Sunkid
Details
Kinderland Horberg
People mover/Moving CarpetCarrying capacity/hour: 710
Manufacturer: Sunkid
Details