
All lifts/cable cars Wildkogel – Neukirchen/Bramberg
Gondola lifts take you up from the villages of Neukirchen and Bramberg to the ski resort on the Wildkogel. The Wildkogel 6-person gondola lift runs from Neukirchen and the 8-person Smaragdbahn gondola lift runs from Bramberg. Both lifts have middle stations. Since the winter of 2017/2018, the new Ganzer X-press 10-person gondola lift in the heart of the Wildkogel Arena has provided access to existing and new slopes. This means that most of the slopes in the ski resort are accessed by gondola lift and detachable (high-speed) chairlifts. Practice lifts and button lifts as well as moving carpets are available for beginners and can be accessed very easily from the mountain stations of the gondola lifts.
Number of ski lifts |
|
Total capacity | 28400 Passengers/hour |
Total lift length | 17.1 km Total |
Other types of ascension mechanisms
New ski lifts
Dürnbach (YOC 2020)
Rope tow/baby lift with low rope towLength: 142 m · Carrying capacity/hour: 655
Manufacturer: Sunkid
Details
List of all current ski lifts
Ganzer X-press (YOC 2017)
10pers. Gondola lift (monocable circulating ropeway)Length: 1510 m · Carrying capacity/hour: 2870
Manufacturer: LEITNER
Details
Smaragdbahn Wildkogel III (YOC 2010)
8pers. Gondola lift (monocable circulating ropeway)Length: 2893 m · Carrying capacity/hour: 2000
Manufacturer: LEITNER
Details
Smaragdbahn Wildkogel IV (YOC 2010)
8pers. Gondola lift (monocable circulating ropeway)Length: 1487 m · Carrying capacity/hour: 2000
Manufacturer: LEITNER
Details
Wildkogelbahn II (YOC 1991)
6pers. Gondola lift (monocable circulating ropeway)Length: 1125 m · Carrying capacity/hour: 2150
Manufacturer: Doppelmayr
Details
Wildkogelbahn I (YOC 1991)
6pers. Gondola lift (monocable circulating ropeway)Length: 1967 m · Carrying capacity/hour: 2150
Manufacturer: Doppelmayr
Details
Frühmesser X-press (YOC 2012)
6pers. High speed chairlift (detachable) with bubbleLength: 1402 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Pfeifferköpfl (YOC 2004)
6pers. High speed chairlift (detachable)Length: 1402 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Gensbichlalmbahn (YOC 2005)
4pers. High speed chairlift (detachable)Length: 1189 m · Carrying capacity/hour: 2000
Manufacturer: LEITNER
Details
Ganzeralmbahn (YOC 1995)
4pers. High speed chairlift (detachable)Length: 947 m · Carrying capacity/hour: 2200
Manufacturer: LEITNER
Details
Braunkogellift (YOC 1990)
T-barLength: 778 m · Carrying capacity/hour: 1440
Manufacturer: Wito
Details
Wennsergletscher I
T-barLength: 380 m · Carrying capacity/hour: 950
Manufacturer: Doppelmayr
Details
Wolkensteinlift (YOC 1998)
J-barLength: 403 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Details
Ganzeralm (YOC 1988)
J-barLength: 310 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Details
Dürnbach (YOC 2020)
Rope tow/baby lift with low rope towLength: 142 m · Carrying capacity/hour: 655
Manufacturer: Sunkid
Details
Wildkogelscharte I (YOC 2013)
Rope tow/baby lift with low rope towLength: 124 m · Carrying capacity/hour: 700
Manufacturer: Sunkid
Details
Wildkogelscharte II (YOC 2013)
Rope tow/baby lift with low rope towLength: 99 m · Carrying capacity/hour: 700
Manufacturer: Sunkid
Details
Kaserboden (YOC 2013)
Rope tow/baby lift with low rope towLength: 242 m · Carrying capacity/hour: 450
Manufacturer: Sunkid
Details
Übungslift Wennsergletscher II
Rope tow/baby lift with low rope towLength: 150 m · Carrying capacity/hour: 500
Manufacturer: Sunkid
Details