All lifts/cable cars Kronplatz (Plan de Corones)
Directly to:
There are only modern chairlifts and gondola lifts at Kronplatz. Just in time for the start of the 2017/2018 winter season, the very popular Sonne lift has been replaced by a 6-person chairlift with covers and heated seats. Two of the cable car lifts have heated leather seats (Ried-Gipfelbahn and Marchner lifts). The Ried-Gipfelbahn lift is a real highlight, taking winter sports enthusiasts up directly from the train station in Percha to the peak of the Kronplatz over a length of 6 km. To ensure children’s safety, gondola lifts have even been installed in beginner areas. Kronplatz has the shortest 8- and 12-person gondola lifts in the world.
Number of ski lifts |
|
Total capacity | 72385 Passengers/hour |
Total lift length | 44.4 km Total |
Planned ski lifts
planned: Kronplatz II (YOC 2024)
10pers. Gondola lift (monocable circulating ropeway)Length: 1160 m · Carrying capacity/hour: 3000
Manufacturer: LEITNER
Details
planned: Kronplatz I (YOC 2024)
10pers. Gondola lift (monocable circulating ropeway)Length: 2871 m · Carrying capacity/hour: 3000
Manufacturer: LEITNER
Details
planned: Plateau
8pers. High speed chairlift (detachable) with bubbleLength: 1192 m · Carrying capacity/hour: 4000
Details
List of all current ski lifts
Belvedere (YOC 2015)
15pers. Gondola lift (monocable circulating ropeway)Length: 1059 m · Carrying capacity/hour: 3300
Manufacturer: Doppelmayr
Details
Skitrans Bronta (YOC 2018)
12pers. Gondola lift (monocable circulating ropeway)Length: 396 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Percha-Ried (YOC 2011)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 4340 m · Carrying capacity/hour: 3200
Manufacturer: LEITNER
Details
Ried-Gipfelbahn (YOC 2010)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 1704 m · Carrying capacity/hour: 4000
Manufacturer: LEITNER
Details
Marchner (YOC 2009)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 1710 m · Carrying capacity/hour: 3000
Manufacturer: LEITNER
Details
Olang I (YOC 2020)
10pers. Gondola lift (monocable circulating ropeway)Length: 3022 m · Carrying capacity/hour: 3900
Manufacturer: Doppelmayr
Details
Olang II (YOC 2020)
10pers. Gondola lift (monocable circulating ropeway)Length: 1063 m · Carrying capacity/hour: 3900
Manufacturer: Doppelmayr
Details
Rara (YOC 2019)
10pers. Gondola lift (monocable circulating ropeway)Length: 570 m · Carrying capacity/hour: 2700
Manufacturer: Doppelmayr
Details
Alpen Connecting (YOC 2013)
10pers. Gondola lift (monocable circulating ropeway)Length: 2206 m · Carrying capacity/hour: 3100
Manufacturer: Doppelmayr
Details
Col Toron (YOC 2011)
9pers. Gondola lift (monocable circulating ropeway)Length: 1369 m · Carrying capacity/hour: 2600
Manufacturer: Agamatic
Details
Miara (YOC 2011)
8pers. Gondola lift (monocable circulating ropeway)Length: 1711 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Piculin (YOC 2006)
8pers. Gondola lift (monocable circulating ropeway)Length: 1630 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Korer (YOC 2005)
8pers. Gondola lift (monocable circulating ropeway)Length: 1050 m · Carrying capacity/hour: 2000
Manufacturer: LEITNER
Details
Piz de Plaies (YOC 2005)
8pers. Gondola lift (monocable circulating ropeway)Length: 1692 m · Carrying capacity/hour: 2700
Manufacturer: Doppelmayr
Details
Pedagà (YOC 2005)
8pers. Gondola lift (monocable circulating ropeway)Length: 632 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
Cianross (YOC 2005)
8pers. Gondola lift (monocable circulating ropeway)Length: 295 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Kronplatz I (YOC 2003)
8pers. Gondola lift (monocable circulating ropeway)Length: 2871 m · Carrying capacity/hour: 2250
Manufacturer: LEITNER
Details
Kronplatz II (YOC 2003)
8pers. Gondola lift (monocable circulating ropeway)Length: 1160 m · Carrying capacity/hour: 2250
Manufacturer: LEITNER
Details
Pre da Peres (YOC 2001)
8pers. Gondola lift (monocable circulating ropeway)Length: 878 m · Carrying capacity/hour: 2200
Manufacturer: Agamatic
Details
Kronplatz 2000 (YOC 2000)
8pers. Gondola lift (monocable circulating ropeway)Length: 4060 m · Carrying capacity/hour: 2000
Manufacturer: LEITNER
Details
Ruis (YOC 1996)
8pers. Gondola lift (monocable circulating ropeway)Length: 1574 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Sonne (YOC 2017)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 701 m · Carrying capacity/hour: 2200
Manufacturer: LEITNER
Details
Arndt (YOC 2018)
6pers. High speed chairlift (detachable) with bubbleLength: 1492 m · Carrying capacity/hour: 2000
Manufacturer: LEITNER
Details
Plateau (YOC 1996)
6pers. High speed chairlift (detachable) with bubbleLength: 1192 m · Carrying capacity/hour: 2445
Manufacturer: LEITNER
Details
Costa (YOC 1994)
4pers. High speed chairlift (detachable)Length: 585 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Skilift Pichl Gsies (YOC 2020)
J-barLength: 488 m · Carrying capacity/hour: 720
Manufacturer: LEITNER
Details
Antermoia (YOC 2016)
J-barLength: 597 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
Details
Berglift Gsies (St. Magdalena) (YOC 2012)
J-barLength: 1250 m · Carrying capacity/hour: 900
Manufacturer: LEITNER
Details
Guggenberglift Taisten (YOC 2005)
J-barLength: 752 m · Carrying capacity/hour: 900
Manufacturer: LEITNER
Details
Riepenlift Antholz (YOC 2002)
J-barLength: 1566 m · Carrying capacity/hour: 900
Manufacturer: LEITNER
Details
Panoramalift Terenten (YOC 2000)
J-barLength: 747 m · Carrying capacity/hour: 900
Manufacturer: LEITNER
Details
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort
Test Reports
Tips for the ski holiday