Ski resorts Austria

All lifts/cable cars Saalbach Hinterglemm Leogang Fieberbrunn (Skicircus)
Directly to:
From the 2015/2016 season, the E5+E6 TirolS 10-person gondola lift has provided a link from Fieberbrunn to Saalbach Hinterglemm Leogang. The ski resort now extends across Tyrol and into the Salzburg region. The ski lifts use state-of-the-art technology and feature a consistent cool logo design. Most of the chairlifts and gondolas transporting skiers up the mountain are high speed and heated. The majority of chairlifts also have protective covers. It doesn’t get better than this. Tow lifts and button lifts are distributed throughout the ski resort for beginners.
Number of ski lifts |
|
Total capacity | 141220 Passengers/hour |
Total lift length | 69.9 km Total |
New ski lifts
Limberg (YOC 2023)
8pers. High speed chairlift (detachable) with bubbleLength: 1370 m · Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
Details
Asitzkogelbahn (YOC 2022)
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 794 m · Carrying capacity/hour: 3700
Manufacturer: Doppelmayr
Details
Planned ski lifts
planned: Saalbach X-Press
10pers. Gondola lift (monocable circulating ropeway)Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Details
planned: Zwölfer-Nordbahn
10pers. Gondola lift (monocable circulating ropeway)Length: 1914 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
List of all current ski lifts
Streuböden (YOC 1991)
15pers. Pulsed-movement aerial ropeway (gondola)Length: 1360 m · Carrying capacity/hour: 1250
Manufacturer: Doppelmayr
Details
Lärchfilzkogel (YOC 1991)
15pers. Pulsed-movement aerial ropeway (gondola)Length: 1524 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Details
Zwölfer-Nordbahn (YOC 1989)
12pers. Gondola lift (monocable circulating ropeway)Length: 1914 m · Carrying capacity/hour: 2196
Manufacturer: Doppelmayr
Details
Reckmoos Nord 2 (YOC 2011)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 378 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Reckmoos Nord 1 (YOC 2011)
10pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 1339 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
12er KOGEL II (YOC 2019)
10pers. Gondola lift (monocable circulating ropeway)Length: 1011 m · Carrying capacity/hour: 3500
Manufacturer: Doppelmayr
Details
12er KOGEL I (YOC 2019)
10pers. Gondola lift (monocable circulating ropeway)Length: 1521 m · Carrying capacity/hour: 3500
Manufacturer: Doppelmayr
Details
Kohlmaisbahn I (YOC 2018)
10pers. Gondola lift (monocable circulating ropeway)Length: 1161 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
Kohlmaisbahn II (YOC 2018)
10pers. Gondola lift (monocable circulating ropeway)Length: 1224 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
Schönleitenbahn 1 (YOC 2016)
10pers. Gondola lift (monocable circulating ropeway)Length: 1617 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
Schönleitenbahn 2 (YOC 2016)
10pers. Gondola lift (monocable circulating ropeway)Length: 1150 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
12er Express (YOC 2016)
10pers. Gondola lift (monocable circulating ropeway)Length: 236 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
TirolS 1 (YOC 2015)
10pers. Gondola lift (monocable circulating ropeway)Length: 2022 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
TirolS 2 (YOC 2015)
10pers. Gondola lift (monocable circulating ropeway)Length: 713 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Steinbergbahn 2 (YOC 2014)
10pers. Gondola lift (monocable circulating ropeway)Length: 1675 m · Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
Details
Steinbergbahn 1 (YOC 2014)
10pers. Gondola lift (monocable circulating ropeway)Length: 2222 m · Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
Details
Bernkogelbahn (YOC 2011)
8pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 2016 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Unterschwarzachbahn (YOC 2010)
8pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 1051 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Details
Reckmoos Süd (YOC 2006)
8pers. Gondola lift (monocable circulating ropeway)Length: 1620 m · Carrying capacity/hour: 2200
Manufacturer: Doppelmayr
Details
Schattberg Sprinter (YOC 2006)
8pers. Gondola lift (monocable circulating ropeway)Length: 699 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Hochalmbahn (YOC 2005)
8pers. Gondola lift (monocable circulating ropeway)Length: 1160 m · Carrying capacity/hour: 2324
Manufacturer: LEITNER
Details
Westgipfelbahn I (YOC 2004)
8pers. Gondola lift (monocable circulating ropeway)Length: 1275 m · Carrying capacity/hour: 2450
Manufacturer: Doppelmayr
Details
Westgipfelbahn II (YOC 2004)
8pers. Gondola lift (monocable circulating ropeway)Length: 1456 m · Carrying capacity/hour: 2450
Manufacturer: Doppelmayr
Details
Schattberg X-press I (YOC 2002)
8pers. Gondola lift (monocable circulating ropeway)Length: 1233 m · Carrying capacity/hour: 2303
Manufacturer: Doppelmayr
Details
Schattberg X-press II (YOC 2002)
8pers. Gondola lift (monocable circulating ropeway)Length: 1546 m · Carrying capacity/hour: 2303
Manufacturer: Doppelmayr
Details
Doischberg (YOC 2001)
8pers. Gondola lift (monocable circulating ropeway)Length: 1488 m · Carrying capacity/hour: 1900
Manufacturer: LEITNER
Details
Reiterkogelbahn (YOC 1997)
8pers. Gondola lift (monocable circulating ropeway)Length: 1249 m · Carrying capacity/hour: 2370
Manufacturer: Doppelmayr
Details
Asitzbahn I (YOC 1991)
8pers. Gondola lift (monocable circulating ropeway)Length: 1443 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Asitzbahn II (YOC 1991)
8pers. Gondola lift (monocable circulating ropeway)Length: 1914 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Asitzkogelbahn (YOC 2022)
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 794 m · Carrying capacity/hour: 3700
Manufacturer: Doppelmayr
Details
Muldenbahn 8er (YOC 2018)
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 548 m · Carrying capacity/hour: 3500
Manufacturer: Doppelmayr
Details
Polten 8er (YOC 2014)
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 795 m · Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
Details
Hasenauer 8er (YOC 2009)
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 913 m · Carrying capacity/hour: 3750
Manufacturer: Doppelmayr
Details
Asitzgipfelbahn 8er (YOC 2008)
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1117 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
Limberg (YOC 2023)
8pers. High speed chairlift (detachable) with bubbleLength: 1370 m · Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
Details
Bernkogel 6er (YOC 2015)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1397 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Rosswald 6er (YOC 2013)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 755 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Wetterkreuz 6er (YOC 2012)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 324 m · Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
Details
Reiter-Ost 6er (YOC 2011)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 909 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Turm 6er (YOC 2009)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 400 m · Carrying capacity/hour: 2370
Manufacturer: Doppelmayr
Details
Schönleiten 6er (YOC 2006)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1286 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Magic 6er (YOC 2005)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1366 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Panorama 6er Kohlmais (YOC 2005)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1379 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Details
Zehner 6er (YOC 2003)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1441 m · Carrying capacity/hour: 2412
Manufacturer: Doppelmayr
Details
Spieleck 6er (YOC 2000)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1715 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Hochalm 6er (YOC 1996)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1750 m · Carrying capacity/hour: 2450
Manufacturer: Doppelmayr
Details
Sunliner 4er (YOC 2000)
4pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1418 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Lärchfilzen (YOC 1999)
4pers. High speed chairlift (detachable) with bubbleLength: 1402 m · Carrying capacity/hour: 1800
Manufacturer: LEITNER
Details
Almbahn (YOC 2009)
4pers. Chairlift (fixed-grip)Length: 1017 m · Carrying capacity/hour: 1480
Manufacturer: Doppelmayr
Details
Hochhörndl (YOC 1996)
4pers. Chairlift (fixed-grip)Length: 1095 m · Carrying capacity/hour: 1400
Manufacturer: LEITNER
Details
Maiskopflift (YOC 2001)
T-barLength: 442 m · Carrying capacity/hour: 800
Manufacturer: LEITNER
Details
Mitteregglift (YOC 1999)
T-barLength: 434 m · Carrying capacity/hour: 833
Manufacturer: Garaventa
Details
Seekarlift (YOC 1979)
T-barLength: 1084 m · Carrying capacity/hour: 1440
Manufacturer: Swoboda
Details
Wieshoflift (YOC 2017)
J-barLength: 154 m · Carrying capacity/hour: 650
Manufacturer: Doppelmayr
Details
Oberschwarzach I (YOC 2016)
J-barLength: 189 m · Carrying capacity/hour: 612
Manufacturer: Doppelmayr
Details
Oberschwarzach II (YOC 2016)
J-barLength: 189 m · Carrying capacity/hour: 635
Manufacturer: Doppelmayr
Details
Übungslift Kraller (YOC 2014)
J-barLength: 312 m · Carrying capacity/hour: 645
Manufacturer: Doppelmayr
Details
Übungslift Asitz (YOC 2006)
J-barLength: 253 m · Carrying capacity/hour: 642
Manufacturer: Doppelmayr
Details
Obingleitn (YOC 2004)
J-barLength: 319 m · Carrying capacity/hour: 800
Manufacturer: LEITNER
Details
Schanteilift (YOC 1998)
J-barLength: 416 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
Details
Funparklift (YOC 1998)
J-barLength: 243 m · Carrying capacity/hour: 720
Manufacturer: Girak
Details
Zillstatt (YOC 1988)
J-barLength: 793 m · Carrying capacity/hour: 800
Manufacturer: LEITNER
Details
Gatterl (YOC 1984)
J-barLength: 835 m · Carrying capacity/hour: 700
Manufacturer: Doppelmayr
Details
Riederfeldlift (YOC 1977)
J-barLength: 520 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Details
Zubringerlift Zwölfer-Nordbahn (YOC 2018)
Rope tow/baby lift with low rope towLength: 80 m · Carrying capacity/hour: 642
Manufacturer: Sunkid
Details
Babylift Kreuzkapelle
Rope tow/baby lift with low rope towLength: 112 m · Carrying capacity/hour: 500
Details
Babylift Viehhofen
Rope tow/baby lift with low rope towLength: 232 m · Carrying capacity/hour: 650
Details
Übungslift Vorderglemm (YOC 2017)
People mover/Moving CarpetLength: 61 m · Carrying capacity/hour: 703
Manufacturer: Sunkid
Details
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort