Ski resorts Italy
All lifts/cable cars Alagna Valsesia/Gressoney-La-Trinité/Champoluc/Frachey (Monterosa Ski)
Directly to:
The transportation between the valleys can be done almost exclusively with high speed chair and gondola lifts. Only the connections from Champoluc and Gressoney-la-Trinité to the rest of the area are with non-detachable chairlifts. The feeder lift from Champoluc was built in 1983 and you must stoop when entering the gondola. The lift systems at the Alpe Mandria chairlift and the Pianalung-Cimalegna-Salati funifor could be optimised.
Number of ski lifts |
|
Total capacity | 33584 Passengers/hour |
Total lift length | 31 km Total |
Other types of ascension mechanisms
List of all current ski lifts
Frachey-Alpe Ciarcerio (YOC 2009)
110pers. FunicularLength: 797 m · Carrying capacity/hour: 1550
Manufacturer: LEITNER
Details
Pianalunga-Cimalegna-Passo die Salati (YOC 2004)
100pers. Funifor - wind stable ropeway with wide rope gaugeLength: 3157 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Details
Stafal-Sant'Anna (YOC 1996)
70pers. Aerial tramway/Reversible ropewayLength: 744 m · Carrying capacity/hour: 1000
Manufacturer: Agudio
Details
Passo dei Salati-Punta Indren (YOC 2009)
60pers. Funifor - wind stable ropeway with wide rope gaugeLength: 1569 m · Carrying capacity/hour: 740
Manufacturer: Doppelmayr
Details
Gabiet-Passo dei Salati (YOC 1991)
12pers. Gondola lift (monocable circulating ropeway)Length: 3013 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Champoluc-Crest (YOC 2018)
8pers. Gondola lift (monocable circulating ropeway)Length: 1121 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Stafal-Gabiet (YOC 2011)
8pers. Gondola lift (monocable circulating ropeway)Length: 2566 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Crest-Alpe Ostafa III (YOC 2005)
8pers. Gondola lift (monocable circulating ropeway)Length: 1414 m · Carrying capacity/hour: 2800
Manufacturer: LEITNER
Details
Alagna-Pianalunga (YOC 2000)
8pers. Gondola lift (monocable circulating ropeway)Length: 2951 m · Carrying capacity/hour: 1400
Manufacturer: Agamatic
Details
Cimalegna-Passo dei Salati (YOC 2017)
4pers. High speed chairlift (detachable) with bubbleLength: 1702 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Sant'Anna-Colle Betta (YOC 1993)
4pers. High speed chairlift (detachable) with bubbleLength: 2346 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Bettaforca (YOC 1993)
4pers. High speed chairlift (detachable)Length: 1532 m · Carrying capacity/hour: 2660
Manufacturer: LEITNER
Details
Alpe Mandria (YOC 1992)
4pers. High speed chairlift (detachable)Length: 1461 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Alpe Ostafa-Colle Sarezza II (YOC 2005)
4pers. Chairlift (fixed-grip)Length: 859 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
Gabiet-Lago (YOC 2006)
3pers. Chairlift (fixed-grip)Length: 379 m · Carrying capacity/hour: 1200
Manufacturer: LEITNER
Details
Bedemie-Seehorn (YOC 2000)
2pers. Chairlift (fixed-grip)Length: 1519 m · Carrying capacity/hour: 1200
Manufacturer: LEITNER
Details
Pianalunga-Bocchetta (YOC 2000)
2pers. Chairlift (fixed-grip)Length: 1206 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Punta Jolanda (YOC 1991)
2pers. Chairlift (fixed-grip)Length: 1319 m · Carrying capacity/hour: 1020
Manufacturer: LEITNER
Details
Lago Ciarcerio-Alpe Belvedere (YOC 1982)
2pers. Chairlift (fixed-grip)Length: 1029 m · Carrying capacity/hour: 900
Manufacturer: LEITNER
Details
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort
Test Reports
Tips for the ski holiday