
All lifts/cable cars Spieljoch – Fügen
Since the 2017/2018 season, the modern Spieljochbahn lift, which includes a middle station, has been travelling up to the ski area on the Spieljoch. The 10-person gondola lift has replaced the old 4-person gondola. Since the 2015/2016 season, the Panoramabahn Geols 8-person gondola lift has provided access to an attractive run. The lift starts at Pankrazberg Landesstraße (halfway up to Hochfügen). Up in the ski area, the slopes can be accessed using two chairlifts and there are virtually no waiting times at the lifts. The highlight is the high-speed detachable Arzjoch 6-person chairlift. Two tow lifts and two moving carpets at the mountain station of the Spieljochbahn lift complete the lift offering. Additional moving carpets can be found slightly below the base station in Fügen.
Number of ski lifts |
|
Total capacity | 16565 Passengers/hour |
Total lift length | 9.8 km Total |
New ski lifts
Förderband Übungwiese Berg 2 (YOC 2021)
People mover/Moving Carpet with coverLength: 69 m · Carrying capacity/hour: 1000
Manufacturer: Sunkid
Details
Planned ski lifts
planned: Onkeljochbahn (YOC 2023)
6pers. High speed chairlift (detachable) with bubbleLength: 1720 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
List of all current ski lifts
Spieljochbahn II (YOC 2017)
10pers. Gondola lift (monocable circulating ropeway)Length: 1710 m · Carrying capacity/hour: 3000
Manufacturer: LEITNER
Details
Spieljochbahn I (YOC 2017)
10pers. Gondola lift (monocable circulating ropeway)Length: 2215 m · Carrying capacity/hour: 3000
Manufacturer: LEITNER
Details
Panoramabahn Geols (YOC 2015)
8pers. Gondola lift with seat heating (monocable circulating ropeway)Length: 1992 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Arzjoch (YOC 2002)
6pers. High speed chairlift (detachable)Length: 798 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Onkeljochbahn (YOC 1989)
3pers. Chairlift (fixed-grip)Length: 1720 m · Carrying capacity/hour: 1500
Manufacturer: Girak
Details
Onkeljochlift (YOC 1979)
T-barLength: 604 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Förderband Übungwiese Berg 2 (YOC 2021)
People mover/Moving Carpet with coverLength: 69 m · Carrying capacity/hour: 1000
Manufacturer: Sunkid
Details
Förderband Übungswiese Tal 1 (YOC 2013)
People mover/Moving CarpetLength: 70 m · Carrying capacity/hour: 620
Manufacturer: Sunkid
Details
Förderband Übungwiese Berg 1 (YOC 2005)
People mover/Moving CarpetLength: 30 m · Carrying capacity/hour: 620
Manufacturer: Sunkid
Details
Förderband Übungswiese Tal 2 (YOC 1998)
People mover/Moving CarpetLength: 30 m · Carrying capacity/hour: 620
Manufacturer: Sunkid
Details