Glockner Group: planned lifts
All planned lifts in the Glockner Group
Overview: planned ski lifts in the Glockner Group
Lift projects at ski resorts in the Glockner Group (renewal, development and integration)
Total: 3
1 1 1
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Glockner Group: planned ski lifts
- Glockner Group – switch to
Tourism regions:
Valleys:
District:
1-3 out of 3 ski resorts
Combined installation (8 pers. chair and 10 pers. gondola)
Length: 1505 m
Carrying capacity/hour: 3000
10pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m
Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1385 m
Carrying capacity/hour: 1800
1-3 out of 3 ski resorts