Ski resorts Nationalpark Region Hohe Tauern
Change lift info:
Nationalpark Region Hohe Tauern: planned lifts
All planned lifts in the Nationalpark Region Hohe Tauern
Overview: planned ski lifts in the Nationalpark Region Hohe Tauern
Lift projects at ski resorts in the Nationalpark Region Hohe Tauern (renewal, development and integration)
Total: 12
4 7 1
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Nationalpark Region Hohe Tauern: planned ski lifts
- Nationalpark Region Hohe Tauern – switch to
States: Tyrol (Tirol) (30), Salzburg (Salzburger Land) (22), Carinthia (Kärnten) (13)
Greater Regions: Upper Carinthia (Oberkärnten) (13)
Districts: Zell am See (13), Sankt Johann im Pongau (7), Spittal an der Drau (5), Tamsweg (1)
Valleys: Salzachtal (9), Gastein Valley (4), Grossarltal (3), Mölltal (2), Raurisertal (1)
Mountain ranges: High Tauern (10), Kitzbüheler Alpen (9), Ankogel Group (6), Zillertal Alps (5), Goldberg Group (3), Glockner Group (1)
1-6 out of 6 ski resorts
32pers. Tricable ropeway
Length: 2200 m
Carrying capacity/hour: 2800
8pers. High speed chairlift (detachable) with bubble
Length: 1043 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable) with bubble and seat heating
8pers. High speed chairlift (detachable) with bubble
Length: 1240 m
Carrying capacity/hour: 4000
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m
Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
8pers. High speed chairlift (detachable) with bubble
Length: 1090 m
Carrying capacity/hour: 2800
4pers. Chairlift (fixed-grip)
Length: 560 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Length: 2100 m
Carrying capacity/hour: 2400
1-6 out of 6 ski resorts