Ski resorts Cottian Alps
Change lift info:
Cottian Alps: planned lifts
All planned lifts in the Cottian Alps
Overview: planned ski lifts in the Cottian Alps
Lift projects at ski resorts in the Cottian Alps (renewal, development and integration)
Total: 11
1 9 1
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Cottian Alps: planned ski lifts
- Cottian Alps – limit to
Park: Queyras (2)
Cottian Alps – switch toValleys: Maurienne (16), Val Chisone (4), Val de Durance (4), Vallée de l'Ubaye (3)
Departments: Savoie (26), Hautes-Alpes (11), Alpes-de-Haute-Provence (3)
Provinces: Turin (Torino) (7), Cuneo (5)
1-7 out of 7 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 972 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 2800
4pers. High speed chairlift (detachable) with bubble
Length: 1423 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 1600
Manufacturer: Poma
4pers. Chairlift (fixed-grip)
Length: 1340 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable)
Length: 2001 m
Carrying capacity/hour: 2600
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2600
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
1-7 out of 7 ski resorts