Ski resorts Provence-Alpes-Côte d’Azur
Change lift info:
Provence-Alpes-Côte d’Azur: planned lifts
All planned lifts in Provence-Alpes-Côte d’Azur
Overview: planned ski lifts in Provence-Alpes-Côte d’Azur
Lift projects at ski resorts in Provence-Alpes-Côte d’Azur (renewal, development and integration)
Total: 15
1 5 9
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Provence-Alpes-Côte d’Azur: planned ski lifts
- Provence-Alpes-Côte d’Azur – limit to
Departments: Hautes-Alpes (11), Alpes-de-Haute-Provence (3), Alpes-Maritimes (1)
Tourism regions: Vallée de l'Ubaye (3), Val d'Allos (Haut Verdon) (3)
Valleys: Val de Durance (4), Vallée de l'Ubaye (3), Val d'Allos (Haut Verdon) (3), Vallée de la Guisane (1)
Provence-Alpes-Côte d’Azur – switch to
1-9 out of 9 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 972 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 2800
4pers. High speed chairlift (detachable) with bubble
Length: 1423 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
Manufacturer: Poma
6pers. High speed chairlift (detachable)
Length: 2001 m
Carrying capacity/hour: 2600
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 1460 m
Carrying capacity/hour: 2800
10pers. Gondola lift (monocable circulating ropeway)
Length: 1472 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable)
Length: 1535 m
Carrying capacity/hour: 2600
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable)
Length: 1034 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
1-9 out of 9 ski resorts