Austria: new lifts 2024/2025
All new lifts in Austria (Österreich) for the 2024/2025 season
Overview: new ski lifts in Austria (Österreich) 2024/2025
New lifts at ski resorts in Austria (Österreich) : renewal of ski lifts or ski resort expansions in Austria (Österreich)
Total: 21
5 1 5 5 1 4
Add lifts and cable cars? Please report here
Austria: new ski lifts 2024/2025
- Austria – limit to
States:
Mountain ranges:
Areas:
1-14 out of 14 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 1360 m
Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
J-bar
Length: 711 m
Carrying capacity/hour: 803
Manufacturer: LEITNER
People mover/Moving Carpet
8pers. High speed chairlift (detachable) with seat heating
Length: 476 m
Carrying capacity/hour: 4570
Manufacturer: Doppelmayr
8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 919 m
Carrying capacity/hour: 2750
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1134 m
Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
J-bar
Length: 301 m
Carrying capacity/hour: 643
Manufacturer: Doppelmayr
T-bar
Length: 650 m
Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Length: 3497 m
Carrying capacity/hour: 1800
Manufacturer: Bartholet BMF
Rope tow/baby lift with low rope tow
10pers. Gondola lift (monocable circulating ropeway)
Length: 995 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1442 m
Carrying capacity/hour: 3600
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble and seat heating
J-bar
Length: 478 m
Carrying capacity/hour: 756
Manufacturer: Doppelmayr
People mover/Moving Carpet
Carrying capacity/hour: 1500
Manufacturer: Sunkid
People mover/Moving Carpet
Length: 168 m
Carrying capacity/hour: 500
Manufacturer: Sunkid
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1320 m
Carrying capacity/hour: 1473
Manufacturer: Doppelmayr
People mover/Moving Carpet with cover
Carrying capacity/hour: 1200
Manufacturer: Sunkid
J-bar
Length: 252 m
Carrying capacity/hour: 653
Manufacturer: Doppelmayr
1-14 out of 14 ski resorts