Combined lifts worldwide
All combined lifts at ski resorts worldwide (CGD worldwide)
Description combined lift (Telemix)
This innovative ropeway system combines the advantages of a detachable gondola lift with those of a detachable chairlift. Gondolas and chairs are used simultaneously, whereby the boarding and exiting areas are separate and the requirements of the individual lift types are met.
Combined lifts/Telemix worldwide
Add lifts and cable cars? Please report here
Worldwide: combined lifts (chair/gondola) (111)
- Worldwide – limit to
Continents: Europe (79), Asia (20), North America (10), Australia and Oceania (2)
Countries: France (25), Austria (17), Russia (11), Switzerland (10), China (9), USA (8), Italy (8), Germany (3), Japan (3), Greece (3), Canada (2), Poland (2), Sweden (2), Slovakia (2), New Zealand (2), Kazakhstan (2), Azerbaijan (2), Norway (1), Serbia (1), South Korea (1)
Mountain ranges: Alps (54), Caucasus Mountains (8), Appalachian Mountains (5), Scandinavian Mountains (Scandes) (3), Rocky Mountains (3), Carpathian Mountains (Karpaty) (2), Sudetes (Sudety) (2), Jura Mountains (Massif du Jura) (2), Tian Shan (Tiānshān) (2), New Zealand Alps (2), Central Uplands of Germany (Deutsche Mittelgebirge) (1), Pacific Coast Ranges (1), Dinaric Alps (1), Apennine Mountains (Appennini) (1), Pyrenees (1)
planned: Esserts–Planards–Savoleyres (YOC 2024)
Combined installation (6 pers. chair and 10 pers. gondola) with seat heatingLength: 2100 m · Carrying capacity/hour: 2100
Details
planned: Prarion-Tracouet (YOC 2023)
Combined installation (6 pers. chair and 10 pers. gondola)Length: 1450 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa
Details
Belle Etoile (YOC 2023)
Combined installation (6 pers. chair and 10 pers. gondola)Length: 1650 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Le Signal (YOC 2016)
Combined installation (8 pers. chair and 10 pers. gondola)Length: 758 m · Carrying capacity/hour: 3370
Manufacturer: Poma
Details
Les Jeux (YOC 2013)
Combined installation (8 pers. chair and 10 pers. gondola)Length: 1355 m · Carrying capacity/hour: 3900
Manufacturer: Poma
Details
Les Sures (YOC 2022)
Combined installation (6 pers. chair and 10 pers. gondola)Length: 683 m · Carrying capacity/hour: 2650
Manufacturer: Poma
Details
Clos Giraud (YOC 2020)
Combined installation (6 pers. chair and 10 pers. gondola)Length: 2450 m · Carrying capacity/hour: 2500
Manufacturer: Bartholet BMF
Details
Telemix Drouvet 1 (YOC 2008)
Combined installation (6 pers. chair and 8 pers. gondola)Length: 1150 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Details
Heniokos (YOC 2015)
Combined installation (6 pers. chair and 8 pers. gondola)Length: 881 m · Carrying capacity/hour: 1191
Manufacturer: Doppelmayr
Details
Alpika K2 (YOC 2017)
Combined installation (4 pers. chair and 8 pers. gondola)Length: 1068 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Alpika K3 (YOC 2017)
Combined installation (4 pers. chair and 8 pers. gondola)Length: 968 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Alpika K4 (YOC 2017)
Combined installation (4 pers. chair and 8 pers. gondola)Length: 1079 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Alpika K5 (YOC 2017)
Combined installation (4 pers. chair and 8 pers. gondola)Length: 613 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details