Ski resorts China
Change lift info:
Combined lifts China
All combined lifts at ski resorts in China (CGD in China)
Description combined lift (Telemix)
This innovative ropeway system combines the advantages of a detachable gondola lift with those of a detachable chairlift. Gondolas and chairs are used simultaneously, whereby the boarding and exiting areas are separate and the requirements of the individual lift types are met.
Combined lifts/Telemix in China
Add lifts and cable cars? Please report here
China: combined lifts (chair/gondola) (9)
- China – limit to
Areas: North China (Huabei) (7), Northeast China (Mandschurei) (1), Northwest China (Xibei) (1)
Provinces: Hebei (7), Heilongjiang (1), Xinjiang (1)
China – switch toMountain ranges: Changbai Mountains (1)
1-5 out of 5 ski resorts
Lift 1 (YOC 2012)
Combined installation (6 pers. chair and 8 pers. gondola) with seat heatingLength: 1936 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
planned: Lift 14b (YOC 2023)
Combined installation (6 pers. chair and 8 pers. gondola)Length: 1164 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
1-5 out of 5 ski resorts