New at Saalbach Hinterglemm Leogang Fieberbrunn (Skicircus)
Planned project
2023/2024
2022/2023
2019/2020
2018/2019
2017/2018
2016/2017
New Asitz II reservoir in Leogang
Construction of a new reservoir with a capacity of around 74,000 m³ at the middle station of the Asitzbahn lift in Leogang.2015/2016
TirolS - Skicircus connection to the ski resort of Fieberbrunn
As well as linking two ski resorts, the “TirolS – 2 states, one lift” project, which was completed in December 2015, also linked the federal states of Tyrol and Salzburg. The link takes the form of a 10-person single cable gondola lift produced by Doppelmayr, capable of transporting 2,600 passengers an hour.New Reiterkogel-Vierstadlalm slope
The new 3.5 km Reiterkogel-Vierstadlalm slope covers an elevation difference of 780 metres and connects Fieberbrunn with Saalbach Hinterglemm.Natural freeride parks
Combined snowpark/freeride areas will be available at various locations within the Skicircus. These will combine freeride and freestyle areas to form natural parks with drops, rails, jumps and kickers.Completion of the Polten reservoir
Work has been completed on the Polten reservoir, with a capacity of 83,700 m3.2014/2015
2013/2014
2012/2013
2011/2012
2010/2011
Unterschwarzachbahn
8pers. Gondola lift with seat heating (monocable circulating ropeway)
2009/2010
2008/2009
Asitzgipfelbahn 8er
8pers. High speed chairlift (detachable) with bubble and seat heating
2006/2007
2005/2006
Panorama 6er Kohlmais
6pers. High speed chairlift (detachable) with bubble and seat heating
2004/2005
2003/2004
2002/2003
2001/2002
2000/2001
1999/2000
1998/1999
1997/1998
1996/1997
1991/1992
1989/1990
1988/1989
1984/1985
1979/1980
1977/1978