Ski resorts Scandinavian Mountains (Scandes)
Scandinavian Mountains (Scandes): planned lifts
All planned lifts in the Scandinavian Mountains
Overview: planned ski lifts in the Scandinavian Mountains
Lift projects at ski resorts in the Scandinavian Mountains (renewal, development and integration)
Total: 22
3 7 12
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Scandinavian Mountains (Scandes): planned ski lifts
- Scandinavian Mountains (Scandes) – switch to
Countries:
1-11 out of 11 ski resorts
8pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble
4pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Length: 1090 m
Carrying capacity/hour: 2800
10pers. Gondola lift (monocable circulating ropeway)
Length: 1658 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
T-bar
Length: 551 m
Carrying capacity/hour: 1100
Manufacturer: LEITNER
T-bar
Length: 765 m
Carrying capacity/hour: 1102
Manufacturer: LEITNER
J-bar
Length: 780 m
Carrying capacity/hour: 806
Manufacturer: LEITNER
J-bar
Length: 386 m
Carrying capacity/hour: 764
Manufacturer: LEITNER
T-bar
Length: 1500 m
Carrying capacity/hour: 1250
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1850 m
Carrying capacity/hour: 2400
1-11 out of 11 ski resorts
