All lifts/cable cars Åre
From modern combined installations to button lifts, the ski resort of Åre offers a wide selection of facilities. Options for accessing the Åreskutan, and the highest point in the ski resort, include a cable car that runs for almost 3 kilometres directly from Åre By. On the front side of the Åreskutan, there is a modern combined installation (8-person chairlift and 8-person gondola) and several chairlifts. The Sadeln (connection between Åre and Björnen) is accessed from both sides by a high-speed 6-person chairlift. The Sadelexpressen even has weather-protection covers and heated seats. The historic Bergbanan (funicular) transports visitors up to the slopes at a leisurely pace directly from the centre of Åre. All over the rear side of the Åreskutan, around Rödkullen and in Åre Björnen, there are only tow lifts and button lifts. Some moving carpets for children and beginners round off the selection of lifts.
Number of ski lifts |
|
Total capacity | 46300 Passengers/hour |
Total lift length | 27.6 km Total |
New ski lifts
Stjärnliften (YOC 2022)
6pers. High speed chairlift (detachable)Length: 843 m · Carrying capacity/hour: 2600
Manufacturer: LEITNER
Details
List of all current ski lifts
Bergbanan (YOC 1910)
60pers. FunicularLength: 790 m · Carrying capacity/hour: 800
Manufacturer: Habegger
Details
Kabinbanan (YOC 1976)
80pers. Aerial tramway/Reversible ropewayLength: 2900 m · Carrying capacity/hour: 480
Manufacturer: Habegger
Details
Olympiagondolen (YOC 1989)
12pers. Gondola lift (monocable circulating ropeway)Length: 1610 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Details
VM8:an (YOC 2006)
Combined installation (8 pers. chair and 8 pers. gondola)Length: 1490 m · Carrying capacity/hour: 3400
Manufacturer: LEITNER
Details
Sadelexpressen (YOC 2013)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1692 m · Carrying capacity/hour: 2800
Manufacturer: LEITNER
Details
Stjärnliften (YOC 2022)
6pers. High speed chairlift (detachable)Length: 843 m · Carrying capacity/hour: 2600
Manufacturer: LEITNER
Details
Fjällgårdsexpressen (YOC 2013)
6pers. High speed chairlift (detachable)Length: 1004 m · Carrying capacity/hour: 2400
Manufacturer: LEITNER
Details
VM6:an (YOC 2002)
6pers. High speed chairlift (detachable)Length: 1100 m · Carrying capacity/hour: 3200
Manufacturer: LEITNER
Details
Hummelliften (YOC 2002)
4pers. Chairlift (fixed-grip)Length: 616 m · Carrying capacity/hour: 1200
Manufacturer: LEITNER
Details
Björnenliften (YOC 2010)
T-barLength: 655 m · Carrying capacity/hour: 1200
Manufacturer: LEITNER
Details
Ullâdalsliften 2
T-barLength: 1171 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Ullâdalsliften 1
T-barLength: 840 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Rödkulleliften 1
T-barLength: 1245 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Rödkulleliften 2
T-barLength: 1245 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Nedre Tväråvalvsliften 1
T-barLength: 844 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Details
Nedre Tväråvalvsliften 2
T-barLength: 900 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Details
Copperhill-Liften
J-barLength: 430 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr
Details