Ski resorts Pennine Alps
Pennine Alps: planned lifts
All planned lifts in the Pennine Alps
Overview: planned ski lifts in the Pennine Alps
Lift projects at ski resorts in the Pennine Alps (renewal, development and integration)
Total: 20
2 9 8 1
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Pennine Alps: planned ski lifts
- Pennine Alps – switch to
Tourism regions:
Valleys:
Canton:
Regions:
Province:
1-8 out of 8 ski resorts
28pers. Tricable ropeway
28pers. Tricable ropeway
8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable) with bubble
Length: 3500 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Length: 2075 m
Carrying capacity/hour: 3200
4pers. High speed chairlift (detachable)
Length: 2000 m
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 2293 m
Carrying capacity/hour: 3000
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble
Length: 1483 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable) with bubble
6pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
Length: 400 m
Carrying capacity/hour: 2000
Manufacturer: Garaventa
10pers. Gondola lift (monocable circulating ropeway)
Length: 940 m
Carrying capacity/hour: 2000
Manufacturer: Garaventa
10pers. Gondola lift (monocable circulating ropeway)
Length: 3000 m
Carrying capacity/hour: 2000
Manufacturer: Garaventa
100pers. Aerial tramway/Reversible ropeway
Length: 1480 m
Carrying capacity/hour: 1200
4pers. High speed chairlift (detachable)
Length: 896 m
Carrying capacity/hour: 2000
60pers. Aerial tramway/Reversible ropeway
Length: 1860 m
Carrying capacity/hour: 360
6pers. High speed chairlift (detachable)
Length: 2454 m
Carrying capacity/hour: 2400
8pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m
Carrying capacity/hour: 1800
1-8 out of 8 ski resorts