Pennine Alps: new lifts 2026/2027
All new lifts in the Pennine Alps for the 2026/2027 season
Overview: new ski lifts in the Pennine Alps 2026/2027
New lifts at ski resorts in the Pennine Alps : renewal of ski lifts or ski resort expansions in the Pennine Alps
Total: 9
4 3 2
Add lifts and cable cars? Please report here
Pennine Alps: new ski lifts 2026/2027
- Pennine Alps – switch to
Tourism regions:
Valleys:
Canton:
Regions:
Province:
1-4 out of 4 ski resorts
6pers. High speed chairlift (detachable) with bubble
Length: 2075 m
Carrying capacity/hour: 3200
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble
6pers. High speed chairlift (detachable)
Length: 1524 m
Carrying capacity/hour: 1600
Manufacturer: Bartholet BMF
10pers. Gondola lift (monocable circulating ropeway)
Length: 1810 m
Carrying capacity/hour: 2200
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 896 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m
Carrying capacity/hour: 1800
1-4 out of 4 ski resorts