Alta Valtellina: planned lifts
All planned lifts in the Alta Valtellina
Overview: planned ski lifts in the Alta Valtellina
Lift projects at ski resorts in the Alta Valtellina (renewal, development and integration)
Total: 6
3 1 2
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Alta Valtellina: planned ski lifts
- Alta Valtellina – switch to
Mountain ranges:
1-2 out of 2 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Graffer
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Graffer
Combined installation (6 pers. chair and 10 pers. gondola)
Length: 1508 m
Carrying capacity/hour: 2800
10pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m
Carrying capacity/hour: 2400
Manufacturer: Graffer
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
Manufacturer: Graffer
4pers. High speed chairlift (detachable) with bubble
Length: 955 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
1-2 out of 2 ski resorts