Ski resorts Austria

All lifts/cable cars Nauders am Reschenpass – Bergkastel
Directly to:
A 6-person gondola lift leads up from the valley to the Nauders ski area. There is also the option of taking two 2-person chairlifts up to the Bergkastel. Almost the entire ski area is linked by high-performance and comfortable chairlifts. All chairlifts have child-safety systems. Nauders was also the first resort in the Alps to install an 8-person chairlift.
Number of ski lifts |
|
Total capacity | 18051 Passengers/hour |
Total lift length | 13.9 km Total |
Other types of ascension mechanisms
New ski lifts
Goldseebahn (YOC 2021)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 867 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
List of all current ski lifts
Bergkastelseilbahn (YOC 1990)
6pers. Gondola lift (monocable circulating ropeway)Length: 2840 m · Carrying capacity/hour: 2270
Manufacturer: Doppelmayr
Details
Zirmbahn (YOC 1999)
8pers. High speed chairlift (detachable)Length: 1159 m · Carrying capacity/hour: 3204
Manufacturer: Doppelmayr
Details
Goldseebahn (YOC 2021)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 867 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Tscheyeckbahn (YOC 2000)
6pers. High speed chairlift (detachable) with bubbleLength: 2231 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Gaislochbahn (YOC 2005)
6pers. High speed chairlift (detachable)Length: 1216 m · Carrying capacity/hour: 2540
Manufacturer: Doppelmayr
Details
Lärchenhang II (YOC 2000)
2pers. Chairlift (fixed-grip)Length: 1370 m · Carrying capacity/hour: 817
Manufacturer: Doppelmayr
Details
Lärchenhang I (YOC 1986)
2pers. Chairlift (fixed-grip)Length: 1592 m · Carrying capacity/hour: 1450
Manufacturer: Doppelmayr
Details
Panoramalift (YOC 1989)
T-barLength: 400 m · Carrying capacity/hour: 750
Manufacturer: Doppelmayr
Details
Ganderbildlift (YOC 1982)
T-barLength: 600 m · Carrying capacity/hour: 900
Manufacturer: Doppelmayr
Details
Almlift (YOC 1978)
T-barLength: 1200 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Details
Tallift (YOC 2005)
J-barLength: 418 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
Details
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort