Western Sudetes: new lifts 2026/2027
All new lifts in the Western Sudetes for the 2026/2027 season
Overview: new ski lifts in the Western Sudetes 2026/2027
New lifts at ski resorts in the Western Sudetes : renewal of ski lifts or ski resort expansions in the Western Sudetes
Total: 6
1 1 3 1
Add lifts and cable cars? Please report here
Western Sudetes: new ski lifts 2026/2027
- Western Sudetes – limit to
Mountain ranges:
Tourism region:
Western Sudetes – switch toState DE:
Voivodeship PL:
Regions CZ:
1-4 out of 4 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 1700 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
Length: 1600 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
4pers. High speed chairlift (detachable)
Length: 1100 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1000 m
Carrying capacity/hour: 3000
100pers. Funifor - wind stable ropeway with wide rope gauge
Length: 1200 m
Carrying capacity/hour: 1200
1-4 out of 4 ski resorts