Tyrol (Tirol): new lifts 2024/2025
All new lifts in Tyrol (Tirol) for the 2024/2025 season
Overview: new ski lifts in Tyrol (Tirol) 2024/2025
New lifts at ski resorts in Tyrol (Tirol) : renewal of ski lifts or ski resort expansions in Tyrol (Tirol)
Total: 11
3 1 3 3 1
Add lifts and cable cars? Please report here
Tyrol (Tirol): new ski lifts 2024/2025
- Tyrol (Tirol) – limit to
Tourism regions:
Greater Regions:
Districts/Cities:
Tyrol (Tirol) – switch toValleys:
Mountain ranges:
Other:
1-6 out of 6 ski resorts
8pers. High speed chairlift (detachable) with seat heating
Length: 476 m
Carrying capacity/hour: 4570
Manufacturer: Doppelmayr
People mover/Moving Carpet
10pers. Gondola lift (monocable circulating ropeway)
Length: 1360 m
Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
J-bar
Length: 711 m
Carrying capacity/hour: 803
Manufacturer: LEITNER
8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 919 m
Carrying capacity/hour: 2750
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1134 m
Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
J-bar
Length: 301 m
Carrying capacity/hour: 643
Manufacturer: Doppelmayr
T-bar
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1320 m
Carrying capacity/hour: 1473
Manufacturer: Doppelmayr
1-6 out of 6 ski resorts