Trentino-Alto Adige (Trentino-Südtirol): new lifts 2015/2016
All new lifts in Trentino-Alto Adige (Trentino-Südtirol) for the 2015/2016 season
Overview: new ski lifts in Trentino-Alto Adige (Trentino-Südtirol) 2015/2016
New lifts at ski resorts in Trentino-Alto Adige (Trentino-Südtirol) : renewal of ski lifts or ski resort expansions in Trentino-Alto Adige (Trentino-Südtirol)
Total: 9
2 3 4
Add lifts and cable cars? Please report here
Trentino-Alto Adige (Trentino-Südtirol): new ski lifts 2015/2016
- Trentino-Alto Adige (Trentino-Südtirol) – limit to
Tourism regions:
Provinces:
Trentino-Alto Adige (Trentino-Südtirol) – switch toMountain ranges:
Other:
1-7 out of 7 ski resorts
6pers. High speed chairlift (detachable)
15pers. Gondola lift (monocable circulating ropeway)
Length: 1059 m
Carrying capacity/hour: 3300
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable) with bubble
Length: 904 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Length: 2200 m
Carrying capacity/hour: 1875
Manufacturer: LEITNER
4pers. High speed chairlift (detachable) with bubble
6pers. High speed chairlift (detachable)
100pers. Funifor - wind stable ropeway with wide rope gauge
70pers. Aerial tramway/Reversible ropeway
8pers. Gondola lift (monocable circulating ropeway)
Length: 1890 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
1-7 out of 7 ski resorts