Ski resorts Trentino-Alto Adige (Trentino-Südtirol)
Trentino-Alto Adige (Trentino-Südtirol): new lifts 2025/2026
All new lifts in Autonomous Region of Trentino-South Tyrol for the 2025/2026 season
Overview: new ski lifts in Autonomous Region of Trentino-South Tyrol 2025/2026
New lifts at ski resorts in Autonomous Region of Trentino-South Tyrol : renewal of ski lifts or ski resort expansions in Autonomous Region of Trentino-South Tyrol
Total: 18
8 4 5 1
Add lifts and cable cars? Please report here
Trentino-Alto Adige (Trentino-Südtirol): new ski lifts 2025/2026
- Trentino-Alto Adige (Trentino-Südtirol) – limit to
Tourism regions:
Provinces:
Trentino-Alto Adige (Trentino-Südtirol) – switch toMountain ranges:
Park:
Other:
1-14 out of 14 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
Length: 863 m
Carrying capacity/hour: 2300
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Length: 2800 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 550 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
J-bar
Length: 585 m
Carrying capacity/hour: 720
Manufacturer: LEITNER
People mover/Moving Carpet
Length: 200 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
10pers. Gondola lift with seat heating (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
30pers. Tricable ropeway
10pers. Gondola lift (monocable circulating ropeway)
4pers. Chairlift (fixed-grip)
Length: 731 m
Carrying capacity/hour: 1790
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1199 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
1-14 out of 14 ski resorts
