Ski resorts Piedmont (Piemonte)
Change lift info:
Piedmont (Piemonte): planned lifts
All planned lifts in Piedmont (Piemonte)
Overview: planned ski lifts in Piedmont (Piemonte)
Lift projects at ski resorts in Piedmont (Piemonte) (renewal, development and integration)
Total: 9
2 7
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Piedmont (Piemonte): planned ski lifts
- Piedmont (Piemonte) – limit to
Provinces: Turin (Torino) (4), Cuneo (3), Verbano-Cusio-Ossola (2)
Piedmont (Piemonte) – switch toMountain ranges: Graian Alps (25), Pennine Alps (21), Cottian Alps (9), Ticino Alps (2), Maritime Alps (2), Ligurian Alps (2)
Valleys: Susa Valley (Val di Susa) (4), Val Chisone (4), Valle Anzasca (1)
1-5 out of 5 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 972 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 2800
4pers. High speed chairlift (detachable) with bubble
Length: 1423 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
Manufacturer: Poma
6pers. High speed chairlift (detachable)
Length: 1530 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable)
Length: 1120 m
Carrying capacity/hour: 3000
2pers. Chairlift (fixed-grip)
Length: 1577 m
Carrying capacity/hour: 1200
8pers. Gondola lift (monocable circulating ropeway)
Length: 1440 m
Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
6pers. High speed chairlift (detachable)
Length: 2454 m
Carrying capacity/hour: 2400
1-5 out of 5 ski resorts