Austria
  • Glungezer – Tulfes
    • Worldwide
    • Europe
    • Austria
    • Tyrol (Tirol)
    • Innsbruck
    • Innsbruck-Land
    • Hall-Wattens Region
Select region
close
Countries
States
Greater Regions
Districts/Cities
Tourism regions

Innovations Glungezer – Tulfes

Innovations at the ski resort Glungezer – Tulfes

Current developments and news

New

Planned project


Schartenkogel Express


6pers. High speed chairlift (detachable) with bubble and seat heating

Details here


2021/2022


Tobbogan Run

The new toboggan run on the Glungezer starts at the mountain station Tulfein and leads to the middle station Halsmarter. approx. 3.3 km in length and 441 meters in altitude with 10 curves

2020/2021


Tulfein Express (Glungezerbahn II)


Combined installation (6 pers. chair and 10 pers. gondola)

Details here


2019/2020


Snowmaking system for guaranteed snow

www.glungezerbahn.at/bautagebuch

2018/2019


Glungezerbahn I (Tulfes-Halsmarter)


10pers. Gondola lift (monocable circulating ropeway)

Details here


New 10-seater gondola lift from the valley station to the Halsmarter mid-station

The 10-seater gondola lift Glungezer I replaces an aging 2-seater chairlift of the same name. Later, the cable car will be supplemented from the Halsmarter mid-station with a second 10-seater gondola lift.

2011/2012


Halsmarter-Express


Rope tow/baby lift with low rope tow

Details here


NEW: GlungezerParks

A park designed by freeriders for freeriders and snowboarders.

1989/1990


Schartenkogel


2pers. Chairlift (fixed-grip)

Details here


1970/1971


Feedback for the Skiresort.info Team? Please use this form