Ski resorts Carinthia (Kärnten)
Change lift info:
Carinthia (Kärnten): planned lifts
All planned lifts in Carinthia (Kärnten)
Overview: planned ski lifts in Carinthia (Kärnten)
Lift projects at ski resorts in Carinthia (Kärnten) (renewal, development and integration)
Total: 13
4 8 1
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Carinthia (Kärnten): planned ski lifts
- Carinthia (Kärnten) – limit to
Greater Regions: Upper Carinthia (Oberkärnten) (13), Klagenfurt-Villach (1)
Districts/Cities: Hermagor (6), Spittal an der Drau (5), Feldkirchen (2), Villach-Land (1)
Carinthia (Kärnten) – switch toTourism regions: Nationalpark Region Hohe Tauern (12), Nassfeld-Pressegger See (6), Nockberge (1), Villach Region (1), Katschberg-Rennweg (1)
Valleys: Gailtal (6), Mölltal (2), Drautal (1)
Mountain ranges: Carnic Main Crest (11), High Tauern (10), Ankogel Group (6), Gurktal Alps (3), Goldberg Group (3), Karawanks (1)
1-6 out of 6 ski resorts
30pers. Tricable ropeway
Length: 3670 m
Carrying capacity/hour: 2800
8pers. Gondola lift (monocable circulating ropeway)
Length: 2680 m
Carrying capacity/hour: 2800
8pers. Gondola lift (monocable circulating ropeway)
Length: 1820 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable) with bubble
Length: 1689 m
Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1800 m
Carrying capacity/hour: 2400
10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1660 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 318 m
Carrying capacity/hour: 2400
8pers. High speed chairlift (detachable) with bubble
Length: 1090 m
Carrying capacity/hour: 2800
4pers. Chairlift (fixed-grip)
Length: 560 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Length: 2100 m
Carrying capacity/hour: 2400
1-6 out of 6 ski resorts