Pongau: planned lifts
All planned lifts in the Pongau
Overview: planned ski lifts in the Pongau
Lift projects at ski resorts in the Pongau (renewal, development and integration)
Total: 11
7 4
Add lifts and cable cars? Please report here
See also:
New lifts 2026/2027
Pongau: planned ski lifts
- Pongau – switch to
Tourism regions:
Valleys:
Mountain ranges:
Other:
1-7 out of 7 ski resorts
8pers. High speed chairlift (detachable) with bubble
Length: 1050 m
Carrying capacity/hour: 3600
6pers. High speed chairlift (detachable) with bubble
Length: 650 m
Carrying capacity/hour: 3000
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 2992 m
Carrying capacity/hour: 3000
10pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m
Carrying capacity/hour: 3000
10pers. Gondola lift (monocable circulating ropeway)
8pers. High speed chairlift (detachable) with bubble
Length: 1240 m
Carrying capacity/hour: 4000
10pers. Gondola lift (monocable circulating ropeway)
Length: 400 m
Carrying capacity/hour: 1800
10pers. Gondola lift (monocable circulating ropeway)
Length: 400 m
Carrying capacity/hour: 1800
1-7 out of 7 ski resorts