Ski resorts Carnic Main Crest
Change lift info:
Carnic Main Crest: planned lifts
All planned lifts on the Carnic Main Crest
Overview: planned ski lifts on the Carnic Main Crest
Lift projects at ski resorts on the Carnic Main Crest (renewal, development and integration)
Total: 11
5 6
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Carnic Main Crest: planned ski lifts
- Carnic Main Crest – switch to
Tourism regions: Nassfeld-Pressegger See (6), 3 Zinnen Dolomites (5), Alta Pusteria (South Tyrol) (5)
Valleys: Gailtal (6), Alta Pusteria (Hochpustertal) (5), Sextental (Valle di Sesto) (5)
District: Hermagor (6)
Provinces: Bolzano (15), Belluno (6)
1-2 out of 2 ski resorts
planned: Pontebba-Nassfeld 1
30pers. Tricable ropewayLength: 3670 m · Carrying capacity/hour: 2800
Details
planned: Pontebba-Nassfeld 2
8pers. Gondola lift (monocable circulating ropeway)Length: 2680 m · Carrying capacity/hour: 2800
Details
planned: Pontebba-Nassfeld 3
8pers. Gondola lift (monocable circulating ropeway)Length: 1820 m · Carrying capacity/hour: 2800
Details
planned: Tröglbahn (YOC 2024)
6pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1773 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Details
planned: Helmissimo
10pers. Gondola lift (monocable circulating ropeway)Length: 3052 m · Carrying capacity/hour: 2800
Details
planned: Stiergarten-Sillianer Hütte
10pers. Gondola lift (monocable circulating ropeway)Length: 1650 m · Carrying capacity/hour: 2400
Details
planned: Valgrande-Popera (YOC 2026)
6pers. High speed chairlift (detachable) with bubbleCarrying capacity/hour: 2400
Details
1-2 out of 2 ski resorts