Trentino-Alto Adige (Trentino-Südtirol): new lifts 2024/2025
All new lifts in Autonomous Region of Trentino-South Tyrol for the 2024/2025 season
Overview: new ski lifts in Autonomous Region of Trentino-South Tyrol 2024/2025
New lifts at ski resorts in Autonomous Region of Trentino-South Tyrol : renewal of ski lifts or ski resort expansions in Autonomous Region of Trentino-South Tyrol
Total: 11
1 7 3
Add lifts and cable cars? Please report here
Trentino-Alto Adige (Trentino-Südtirol): new ski lifts 2024/2025
- Trentino-Alto Adige (Trentino-Südtirol) – limit to
Tourism regions:
Provinces:
Trentino-Alto Adige (Trentino-Südtirol) – switch toMountain ranges:
Other:
1-11 out of 11 ski resorts
6pers. High speed chairlift (detachable) with bubble and seat heating
8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1184 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 776 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 1325 m
Carrying capacity/hour: 1500
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable)
Length: 1200 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
J-bar
Length: 626 m
Carrying capacity/hour: 800
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 1000 m
Carrying capacity/hour: 1800
1-11 out of 11 ski resorts