Ski resorts Italy
All lifts/cable cars Passo San Pellegrino/Falcade
Directly to:
Most of the lifts in the ski resort are modern and fast. Around Passo San Pellegrino, the slopes are linked by fixed-grip and high-speed chairlifts as well as button lifts and moving carpets. A cable car also runs from Passo San Pellegrino to the Col Margherita (2,513 m). From Falcade, a modern gondola lift takes you to the ski resort at Le Buse. A moving carpet and a button lift are available here for beginners. High-speed chairlifts then take you up to the Col Margherita. Several chairlifts have weather-protection covers.
Number of ski lifts |
|
Total capacity | 24480 Passengers/hour |
Total lift length | 15.3 km Total |
Other types of ascension mechanisms
List of all current ski lifts
Col Margherita (YOC 1982)
96pers. Aerial tramway/Reversible ropewayLength: 1395 m · Carrying capacity/hour: 1330
Manufacturer: Agudio
Details
Molino-Le Buse (YOC 2015)
8pers. Gondola lift (monocable circulating ropeway)Length: 1890 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Costabella (YOC 2005)
4pers. High speed chairlift (detachable) with bubbleLength: 1620 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Saline-Laresei (YOC 2005)
4pers. High speed chairlift (detachable) with bubbleLength: 1423 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Lago Cavia-Col Margherita (YOC 1999)
4pers. High speed chairlift (detachable) with bubbleLength: 2028 m · Carrying capacity/hour: 1800
Manufacturer: Agamatic
Details
Le Buse-Laresei (YOC 1990)
4pers. High speed chairlift (detachable)Length: 1209 m · Carrying capacity/hour: 2400
Manufacturer: Agamatic
Details
Gigante (YOC 1989)
4pers. High speed chairlift (detachable)Length: 1559 m · Carrying capacity/hour: 2400
Manufacturer: Agamatic
Details
Lago Cavia-Laresei (YOC 2003)
4pers. Chairlift (fixed-grip)Length: 308 m · Carrying capacity/hour: 1490
Manufacturer: Doppelmayr
Details
Campigol (YOC 1999)
4pers. Chairlift (fixed-grip)Length: 531 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
Details
Del Passo (YOC 1997)
4pers. Chairlift (fixed-grip)Length: 395 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Details
Cima Uomo (YOC 1984)
2pers. Chairlift (fixed-grip)Length: 738 m · Carrying capacity/hour: 1200
Manufacturer: Zemella
Details
Campo Scuola-Le Buse (YOC 2018)
J-barLength: 353 m · Carrying capacity/hour: 900
Manufacturer: LEITNER
Details
Chiesetta 2 (YOC 2002)
J-barLength: 743 m · Carrying capacity/hour: 830
Manufacturer: LEITNER
Details
Capanna Margherita (YOC 2002)
J-barLength: 407 m · Carrying capacity/hour: 900
Manufacturer: LEITNER
Details
Chiesetta 1 (YOC 2001)
J-barLength: 741 m · Carrying capacity/hour: 830
Manufacturer: LEITNER
Details
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort
Test Reports
Tips for the ski holiday