Ski resorts Scandinavia
Scandinavia: planned lifts
All planned lifts in Scandinavia
Overview: planned ski lifts in Scandinavia
Lift projects at ski resorts in Scandinavia (renewal, development and integration)
Total: 29
3 1 11 14
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Scandinavia: planned ski lifts
- Scandinavia – limit to
Countries:
Mountain range:
1-18 out of 18 ski resorts
8pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble
4pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Length: 1090 m
Carrying capacity/hour: 2800
10pers. Gondola lift (monocable circulating ropeway)
Length: 1658 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
T-bar
Length: 551 m
Carrying capacity/hour: 1100
Manufacturer: LEITNER
T-bar
Length: 765 m
Carrying capacity/hour: 1102
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
Length: 830 m
Carrying capacity/hour: 3200
J-bar
Length: 780 m
Carrying capacity/hour: 806
Manufacturer: LEITNER
J-bar
Length: 386 m
Carrying capacity/hour: 764
Manufacturer: LEITNER
T-bar
Length: 1500 m
Carrying capacity/hour: 1250
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
Length: 1850 m
Carrying capacity/hour: 2400
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1440 m
Carrying capacity/hour: 2400
1-18 out of 18 ski resorts
