Power Pass: planned lifts
All planned lifts Power Pass
Overview: planned ski lifts Power Pass
Lift projects at ski resorts Power Pass (renewal, development and integration)
Total: 20
2 1 15 2
Add lifts and cable cars? Please report here
See also:
New lifts 2026/2027
Power Pass: planned ski lifts
- Power Pass – switch to
Countries:
1-4 out of 4 ski resorts
Rope tow/baby lift with low rope tow
Length: 150 m
Carrying capacity/hour: 600
Rope tow/baby lift with low rope tow
Length: 100 m
Carrying capacity/hour: 600
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2285 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
8pers. Gondola lift (monocable circulating ropeway)
Length: 6800 m
Carrying capacity/hour: 2000
1-4 out of 4 ski resorts