Puster Valley (Pustertal): new lifts 2026/2027
All new lifts in the Puster Valley (Pustertal) for the 2026/2027 season
Overview: new ski lifts in the Puster Valley (Pustertal) 2026/2027
New lifts at ski resorts in the Puster Valley (Pustertal) : renewal of ski lifts or ski resort expansions in the Puster Valley (Pustertal)
Total: 7
5 2
Add lifts and cable cars? Please report here
Puster Valley (Pustertal): new ski lifts 2026/2027
- Puster Valley (Pustertal) – limit to
Valley:
Puster Valley (Pustertal) – switch toTourism regions:
Mountain ranges:
1-4 out of 4 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 2176 m
Carrying capacity/hour: 3250
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 1819 m
Carrying capacity/hour: 3250
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Length: 1568 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
8pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable) with bubble
Length: 820 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 3052 m
Carrying capacity/hour: 3000
Manufacturer: LEITNER
6pers. Gondola lift (monocable circulating ropeway)
Length: 745 m
Carrying capacity/hour: 2400
1-4 out of 4 ski resorts