Ski resorts Trentino-Alto Adige (Trentino-Südtirol)
Change lift info:
Trentino-Alto Adige (Trentino-Südtirol): new lifts 2024/2025
All new lifts in Trentino-Alto Adige (Trentino-Südtirol) for the 2024/2025 season
Overview: new ski lifts in Trentino-Alto Adige (Trentino-Südtirol) 2024/2025
New lifts at ski resorts in Trentino-Alto Adige (Trentino-Südtirol) : renewal of ski lifts or ski resort expansions in Trentino-Alto Adige (Trentino-Südtirol)
Total: 7
5 2
Add lifts and cable cars? Please report here
Trentino-Alto Adige (Trentino-Südtirol): new ski lifts 2024/2025
- Trentino-Alto Adige (Trentino-Südtirol) – limit to
Tourism regions: Trentino (4), South Tyrol (Südtirol) (3)
Provinces: Trient (4), Bolzano (3)
Trentino-Alto Adige (Trentino-Südtirol) – switch to
1-5 out of 5 ski resorts
6pers. High speed chairlift (detachable) with bubble
Length: 685 m
Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
Length: 4650 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 1160 m
Carrying capacity/hour: 3000
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 2871 m
Carrying capacity/hour: 3000
Manufacturer: LEITNER
8pers. High speed chairlift (detachable) with bubble
Length: 1192 m
Carrying capacity/hour: 4000
8pers. Gondola lift (monocable circulating ropeway)
Length: 3000 m
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 4650 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
1-5 out of 5 ski resorts