Change lift info:

South Tyrol (Südtirol): new lifts 2017/2018

All new lifts in South Tyrol (Südtirol) for the 2017/2018 - season - new lifts at ski resorts in South Tyrol (Südtirol) : renewal of ski lifts or ski resort expansions in South Tyrol (Südtirol)


Overview: new ski lifts in South Tyrol (Südtirol) 2017/2018

Total: 6
3
2
1

Add lifts and cable cars? Please report here



Map: new lift in South Tyrol (Südtirol)

Show map
South Tyrol (Südtirol) – limit to

South Tyrol (Südtirol) – switch to

South Tyrol (Südtirol): new ski lifts 2017/2018

1-5 out of 5 ski resorts

Piz Setëur I (YOC 2017)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1030 m · Carrying capacity/hour: 3450
Manufacturer: Leitner
Ski resort: Gröden (Val Gardena) [Wolkenstein]
Replacement lift: 4pers. High speed chairlift (detachable)

Piz Setëur II (YOC 2017)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 426 m · Carrying capacity/hour: 3450
Manufacturer: Leitner
Ski resort: Gröden (Val Gardena) [Wolkenstein]

Furdenan (YOC 2017)

J-bar
Length: 450 m · Carrying capacity/hour: 720
Ski resort: Gröden (Val Gardena) [Seiser Alm]
Replacement lift: J-bar
All lifts

Sonne (YOC 2017)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 691 m · Carrying capacity/hour: 2600
Manufacturer: Leitner
Ski resort: Kronplatz (Plan de Corones) [San Vigilio]
Replacement lift: 4pers. High speed chairlift (detachable) with bubble
All lifts

Biok (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 928 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Replacement lift: 4pers. High speed chairlift (detachable)
All lifts

Furdenan (YOC 2017)

J-bar
Length: 450 m · Carrying capacity/hour: 720
Replacement lift: J-bar
All lifts

Lazaun (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1258 m · Carrying capacity/hour: 1980
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts
1-5 out of 5 ski resorts