Ski resorts USA
1/8 Ski lifts/ropeways Alta
High-speed detachable chairlifts start from both base stations, Wildcat Base and Albion Base, and take you into the ski area. At the top of the ski area, there are additional high-speed chairlifts. The two base stations are connected by the Transfer Tow, which can be used in both directions. Short lifts lead to the lodges (accommodations) in the valley, some of which are also used by beginners. The ski school operates a conveyor belt.
Number of ski lifts |
|
Total capacity | 13200 Passengers/hour |
Total lift length | 8.8 km Total |
Directly to:
Other types of ascension mechanisms
Towns/villages at the ski resort (distance from town center):
Alta (0.2 km), Snowbird (2.5 km), Salt Lake City (46 km), Sandy (21 km), Towns/villages at the ski resort
Alta (0.2 km), Snowbird (2.5 km), Salt Lake City (46 km), Sandy (21 km), Towns/villages at the ski resort
New ski lifts
6pers. High speed chairlift (detachable)
Planned ski lifts
32pers. Tricable ropeway
4pers. High speed chairlift (detachable)
Length: 1310 m
Carrying capacity/hour: 2400
List of all current ski lifts
6pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
2pers. Chairlift (fixed-grip)
J-bar
Rope tow/baby lift with low rope tow
Feedback for the Skiresort.info Team? Please use this form
Book this ski resort
Test Reports
Tips for the ski holiday
