New
2025/2026
NEW - An interactive ski escape game as an adventure tour
In the Seiser Alm ski area, families, teenagers, and the young at heart can enjoy an interactive escape game along the Seiser Alm Ronda, spanning the entire ski resort. Participants can choose between two difficulty levels and complete the route in a single day or over several days. Equipped with a treasure map, they collect symbols, solve riddles via an app, and interact with the surroundings.2022/2023
Spitzbühl chairlift (Opening winter 2022)
The new Spitzbühl 6-seater high speed chairlift replaces the Spitzbühl 2-seater chairlift on the same route. With weather protection cover (bubble) and seat heating, the 6-seater chairlift offers more comfort, a shorter journey time and increased transport capacity. Construction of the modern lift system began in autumn 2021 and will completed in time for the 2022/23 winter season.2021/2022
New slope Pilat to Ortisei (St. Ulrich)
The "Pilat": The former off-piste downhill stretching across a rocky forest from the Seiser Alm to Ortisei was carefully prepared and developed to become a spectacular downhill slope cutting through a forest, featuring plenty of bends and turns with unique views over the entirety of Val Gardena. Length 4,703 m, HM 778 m, average/maximum incline 17/60%.2019/2020
What's new on the Seiser Alm in winter 19/20
Just in time for the winter season, the Bamby Lift is being unveiled in a new form: a detachable chairlift with 6 seats, fully automated child safety system, and weather protection hood is going into operation. To improve the connection between the Paradiso and Bamby facilities, a conveyor belt is being installed between Bamby Valley and Paradiso Valley. There is also news on the sunny side of the Seiser Alm: on the main slope Monte Piz above Hotel Icaro, a new slope overpass has been constructed.2018/2019
80 Years Seiser Alm
In the winter of 2018/19, the Seiser Alm ski area celebrates its 80th anniversary.New six-seater chairlift Mezdì
This year's winter season comes with a special highlight: In the Piz area, the new six-seater chairlift "Mezdì" will be opened.The modern and comfortable detachable chairlift replaces the old double chairlift on the Seiser Alm. The new stations were designed in the "Pininfarina design" by the company Leitner. The lift offers fully automatic station garaging at both the mountain and valley stations. With a speed of 5 meters per second, the high-speed chairlift covers a total of 921 meters and 2
2017/2018
New ski slope
The new ski slope on the Bullaccia/Puflatsch mountain starts at 2104 m and has 304 m of elevation gain. The “Race” slope is a black run of 1337 m length and a maximum inclination of 58%. The slope is reserved to experts.2012/2013
Strengthening and optimization of the snowmaking systems
2010/2011
Increase in the capacity of the Panorama lift
from 2200 people per hour to 26002009/2010
2008/2009
2006/2007
2004/2005
2002/2003
Goldknopf/Punta d'Oro
4pers. High speed chairlift (detachable) with bubble and seat heating
2001/2002
1999/2000
1998/1999
1997/1998
1996/1997
1994/1995
1993/1994
1991/1992
1989/1990
1982/1983
1975/1976
Feedback for the Skiresort.info Team? Please use this form
Book this ski resort
Tips for the ski holiday
