Ski resorts Wasatch Mountains
Change lift info:
Wasatch Mountains: planned lifts
All planned lifts in the Wasatch Mountains
Overview: planned ski lifts in the Wasatch Mountains
Lift projects at ski resorts in the Wasatch Mountains (renewal, development and integration)
Total: 14
1 3 10
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
1-7 out of 7 ski resorts
8pers. High speed chairlift (detachable)
Length: 1637 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1071 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
32pers. Tricable ropeway
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
4pers. Chairlift (fixed-grip)
Length: 600 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
32pers. Tricable ropeway
4pers. High speed chairlift (detachable)
Length: 1310 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 1158 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
8pers. Gondola lift (monocable circulating ropeway)
Length: 6800 m
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
1-7 out of 7 ski resorts