Ski resorts Southern Germany
Change lift info:
Southern Germany: planned lifts
All planned lifts in Southern Germany
Overview: planned ski lifts in Southern Germany
Lift projects at ski resorts in Southern Germany (renewal, development and integration)
Total: 15
4 9 2
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Southern Germany: planned ski lifts
- Southern Germany – limit to
States: Bavaria (Bayern) (14), Baden-Württemberg (1)
Tourism region: Allgäu (6)
Southern Germany – switch to
1-11 out of 11 ski resorts
8pers. High speed chairlift (detachable) with bubble
Length: 1030 m
Carrying capacity/hour: 3000
8pers. Gondola lift (monocable circulating ropeway)
Length: 1450 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable) with bubble
Length: 1970 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
Length: 458 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1250 m
Carrying capacity/hour: 2600
4pers. Chairlift (fixed-grip)
Length: 500 m
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 1824 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Length: 2480 m
Carrying capacity/hour: 2000
4pers. Chairlift (fixed-grip)
Length: 886 m
Carrying capacity/hour: 2035
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
Length: 1300 m
Carrying capacity/hour: 1500
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1019 m
Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 250 m
Carrying capacity/hour: 1500
1-11 out of 11 ski resorts