West Eastern Alps: new lifts 2025/2026
All new lifts in the West Eastern Alps for the 2025/2026 season
Overview: new ski lifts in the West Eastern Alps 2025/2026
New lifts at ski resorts in the West Eastern Alps : renewal of ski lifts or ski resort expansions in the West Eastern Alps
Total: 8
1 4 2 1
Add lifts and cable cars? Please report here
West Eastern Alps: new ski lifts 2025/2026
- West Eastern Alps – limit to
Mountain ranges:
West Eastern Alps – switch toCanton:
Region:
1-5 out of 5 ski resorts
6pers. High speed chairlift (detachable) with bubble
Length: 1615 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1324 m
Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2000
Manufacturer: MND Ropeways
4pers. Chairlift (fixed-grip)
Length: 240 m
Carrying capacity/hour: 2291
Manufacturer: Doppelmayr
J-bar
Length: 393 m
Carrying capacity/hour: 895
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Length: 1830 m
Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
J-bar
Length: 480 m
Carrying capacity/hour: 720
Manufacturer: LEITNER
1-5 out of 5 ski resorts