Ski resorts Rocky Mountains
Change lift info:
Rocky Mountains: new lifts 2021/2022
All new lifts in the Rocky Mountains for the 2021/2022 season
Overview: new ski lifts in the Rocky Mountains 2021/2022
New lifts at ski resorts in the Rocky Mountains : renewal of ski lifts or ski resort expansions in the Rocky Mountains
Total: 17
1 15 1
Add lifts and cable cars? Please report here
Rocky Mountains: new ski lifts 2021/2022
- Rocky Mountains – limit to
Mountain ranges: Wasatch Mountains (5), Front Range (2), Sawatch Range (2), Canadian Rockies (1), Elk Mountains (1), Madison Range (1)
Rocky Mountains – switch toCountries: USA (43), Canada (9)
Provinces CAN: Alberta (2)
States US: Colorado (5), Utah (5), Idaho (2), Montana (2), Wyoming (2)
1-12 out of 12 ski resorts
4pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
Length: 843 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
6pers. High speed chairlift (detachable)
Length: 2110 m
Carrying capacity/hour: 3000
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable) with bubble and seat heating
3pers. Chairlift (fixed-grip)
Length: 284 m
Carrying capacity/hour: 1500
Manufacturer: Skytrac Inc.
3pers. Chairlift (fixed-grip)
Length: 1000 m
Carrying capacity/hour: 1500
Manufacturer: Skytrac Inc.
4pers. High speed chairlift (detachable)
Length: 1525 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 304 m
Carrying capacity/hour: 1250
Manufacturer: Doppelmayr
8pers. Gondola lift (monocable circulating ropeway)
Length: 1130 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
3pers. Chairlift (fixed-grip)
Carrying capacity/hour: 1500
Manufacturer: Skytrac Inc.
3pers. Chairlift (fixed-grip)
Length: 1000 m
Carrying capacity/hour: 1500
Manufacturer: Skytrac Inc.
People mover/Moving Carpet
Length: 180 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 2438 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1000 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
1-12 out of 12 ski resorts