Change lift info:

Central Uplands of Germany (Deutsche Mittelgebirge): planned lifts

All planned lifts in the Central Uplands of Germany (Deutsche Mittelgebirge) - Lift projects at ski resorts in the Central Uplands of Germany (Deutsche Mittelgebirge) (renewal, development and integration)


Overview: planned ski lifts in the Central Uplands of Germany (Deutsche Mittelgebirge)

Total: 10
2
7
1

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in the Central Uplands of Germany (Deutsche Mittelgebirge)

Show map
Central Uplands of Germany (Deutsche Mittelgebirge) – limit to

Central Uplands of Germany (Deutsche Mittelgebirge) – switch to

Central Uplands of Germany (Deutsche Mittelgebirge): planned ski lifts

1-7 out of 7 ski resorts

planned: Haupthangbahn (YOC 2018)

8pers. High speed chairlift (detachable) with bubble
Length: 950 m · Carrying capacity/hour: 2800
Replacement lift: T-bar
T-bar

planned: Himmelsleiterbahn (YOC 2018)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1120 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
All lifts

planned: Köhlerhagen K 1 (YOC 2018)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1500 m · Carrying capacity/hour: 3000
Replacement lift: T-bar
T-bar
All lifts

planned: Westfalenhang I (YOC 2018)

4pers. High speed chairlift (detachable)
Length: 650 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: T-bar
All lifts

planned: Skiarena Harz I (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1260 m · Carrying capacity/hour: 2000

planned: Skiarena Harz II (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1350 m · Carrying capacity/hour: 2000
All lifts

planned: Am Fellberg 2

4pers. Chairlift (fixed-grip)
Length: 900 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Am Fellberg 1

2pers. Chairlift (fixed-grip)
Length: 600 m · Carrying capacity/hour: 1000
Replacement lift: T-bar
All lifts

planned: Erstebergbahn (YOC 2017)

2pers. Chairlift (fixed-grip)
Length: 600 m · Carrying capacity/hour: 1000
Replacement lift: J-bar
All lifts

planned: Skilift am Eisenberg 2 (YOC 2017)

T-bar
Length: 1000 m · Carrying capacity/hour: 1000
Replacement lift: J-bar
All lifts
1-7 out of 7 ski resorts