Ski resorts Alta Pusteria (Hochpustertal)
Change lift info:
Alta Pusteria (Hochpustertal): planned lifts
All planned lifts in Alta Pusteria (Hochpustertal)
Overview: planned ski lifts in Alta Pusteria (Hochpustertal)
Lift projects at ski resorts in Alta Pusteria (Hochpustertal) (renewal, development and integration)
Total: 5
2 3
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Alta Pusteria (Hochpustertal): planned ski lifts
- Alta Pusteria (Hochpustertal) – limit to
Valley: Sextental (Valle di Sesto) (5)
Alta Pusteria (Hochpustertal) – switch toTourism regions: South Tyrol (Südtirol) (15), 3 Zinnen Dolomites (5), Alta Pusteria (South Tyrol) (5)
Mountain ranges: Dolomites (20), Carnic Main Crest (10)
1-1 out of 1 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 3052 m
Carrying capacity/hour: 2800
10pers. Gondola lift (monocable circulating ropeway)
Length: 1650 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Length: 500 m
Carrying capacity/hour: 2800
1-1 out of 1 ski resorts