Ski resorts Rocky Mountains
Change lift info:
Rocky Mountains: new lifts 2024/2025
All new lifts in the Rocky Mountains for the 2024/2025 season
Overview: new ski lifts in the Rocky Mountains 2024/2025
New lifts at ski resorts in the Rocky Mountains : renewal of ski lifts or ski resort expansions in the Rocky Mountains
Total: 35
2 29 3 1
Add lifts and cable cars? Please report here
Rocky Mountains: new ski lifts 2024/2025
- Rocky Mountains – limit to
Mountain ranges: Wasatch Mountains (9), Madison Range (5), Canadian Rockies (2), San Juan Mountains (2), Sangre de Cristo Range (2), Elk Mountains (2), Sawatch Range (1)
Rocky Mountains – switch toCountries: USA (52), Canada (18)
Provinces CAN: British Columbia (9), Alberta (2)
States US: Utah (10), Colorado (9), Montana (9), Idaho (3), New Mexico (2)
1-22 out of 22 ski resorts
8pers. High speed chairlift (detachable)
Length: 1637 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1071 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble and seat heating
4pers. Chairlift (fixed-grip)
Length: 600 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1590 m
Carrying capacity/hour: 3000
J-bar
Carrying capacity/hour: 720
Manufacturer: Leitner-Poma
8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 2652 m
Carrying capacity/hour: 2745
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1820 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Length: 1310 m
Carrying capacity/hour: 3000
6pers. High speed chairlift (detachable)
Length: 1501 m
Carrying capacity/hour: 3000
6pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
Length: 1200 m
Carrying capacity/hour: 2000
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 1158 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 250 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 800 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
2pers. Chairlift (fixed-grip)
Length: 1300 m
Carrying capacity/hour: 1200
2pers. Chairlift (fixed-grip)
Carrying capacity/hour: 1200
4pers. Chairlift (fixed-grip)
Length: 500 m
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Length: 1220 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
2pers. Chairlift (fixed-grip)
Length: 1569 m
Carrying capacity/hour: 850
3pers. Chairlift (fixed-grip)
Length: 1385 m
Carrying capacity/hour: 1500
Manufacturer: Leitner-Poma
3pers. Chairlift (fixed-grip)
8pers. Gondola lift (monocable circulating ropeway)
Length: 6800 m
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable)
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Manufacturer: Doppelmayr
J-bar
Length: 268 m
Carrying capacity/hour: 700
Manufacturer: Leitner-Poma
Rope tow/baby lift with low rope tow
Carrying capacity/hour: 500
1-22 out of 22 ski resorts