Ski resorts Andorra
1/10 Ski lifts/ropeways Ordino Arcalís
Most of the ski area can be accessed via fast, detachable chairlifts. In addition, there are two fixed-grip four-seater chairlifts as well as several platter lifts.
Number of ski lifts |
|
Total capacity | 17258 Passengers/hour |
Total lift length | 10.3 km Total |
Directly to:
Other types of ascension mechanisms
Towns/villages at the ski resort (distance from town center):
L'Hortell (0 km), Els Planells (0.1 km), El Serrat (5 km), Llorts (8 km), Towns/villages at the ski resort
L'Hortell (0 km), Els Planells (0.1 km), El Serrat (5 km), Llorts (8 km), Towns/villages at the ski resort
New ski lifts
J-bar
Length: 334 m
Carrying capacity/hour: 738
Manufacturer: Doppelmayr
Planned ski lifts
6pers. High speed chairlift (detachable)
Length: 1971 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 1303 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 734 m
Carrying capacity/hour: 1800
List of all current ski lifts
10pers. Gondola lift (monocable circulating ropeway)
Length: 1517 m
Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
4pers. Chairlift (fixed-grip)
J-bar
Length: 334 m
Carrying capacity/hour: 738
Manufacturer: Doppelmayr
J-bar
Length: 378 m
Carrying capacity/hour: 600
Manufacturer: Doppelmayr
Rope tow/baby lift with low rope tow
Rope tow/baby lift with low rope tow
Rope tow/baby lift with low rope tow
People mover/Moving Carpet with cover
Length: 60 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
Feedback for the Skiresort.info Team? Please use this form
Book this ski resort
Test Reports
Tips for the ski holiday
