The Pécy platter lift was previously installed in the ski area as the Echappeux platter lift. It serves the newly designed beginner area at the mountain station of the simultaneously constructed Combelouvière 10-seater gondola lift.
Lift name
Pécy
Status
planned
Type
J-bar
Manufacturer
Doppelmayr
Year of construction
planned
2026
2026
Height/length
300 m
Speed
2 metres per second
Transit time
approx. 2:50 minutes
Carrying capacity
800 people per hour
Towns/villages at the ski resort (distance from town center):
Valmorel (0.2 km), Longchamp (0.2 km), Saint François Longchamp (0.1 km), Towns/villages at the ski resort
Valmorel (0.2 km), Longchamp (0.2 km), Saint François Longchamp (0.1 km), Towns/villages at the ski resort