Ski resorts Lombardy
Lombardy: planned lifts
All planned lifts in Lombardy
Overview: planned ski lifts in Lombardy
Lift projects at ski resorts in Lombardy (renewal, development and integration)
Total: 17
1 7 1 7 1
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Lombardy: planned ski lifts
- Lombardy – limit to
Tourism region:
Provinces:
Valleys:
Lombardy – switch toMountain ranges:
Park:
1-10 out of 10 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 2100 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 2125 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 1800
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Graffer
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Graffer
Combined installation (6 pers. chair and 10 pers. gondola)
Length: 1508 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
Manufacturer: Graffer
4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
80pers. Aerial tramway/Reversible ropeway
Length: 2133 m
Carrying capacity/hour: 800
6pers. High speed chairlift (detachable) with bubble
Length: 1428 m
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 2146 m
Carrying capacity/hour: 3470
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 1000 m
Carrying capacity/hour: 2000
10pers. Gondola lift (monocable circulating ropeway)
Length: 1900 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
2pers. Chairlift (fixed-grip)
Length: 1322 m
Carrying capacity/hour: 785
Manufacturer: Graffer
1-10 out of 10 ski resorts
