Southern Europe: new lifts 2015/2016
All new lifts in Southern Europe for the 2015/2016 season
Overview: new ski lifts in Southern Europe 2015/2016
New lifts at ski resorts in Southern Europe : renewal of ski lifts or ski resort expansions in Southern Europe
Total: 20
4 3 2 7 4
Add lifts and cable cars? Please report here
Southern Europe: new ski lifts 2015/2016
- Southern Europe – limit to
Countries:
1-14 out of 14 ski resorts
6pers. High speed chairlift (detachable)
15pers. Gondola lift (monocable circulating ropeway)
Length: 1059 m
Carrying capacity/hour: 3300
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable) with bubble
Length: 904 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Length: 2200 m
Carrying capacity/hour: 1875
Manufacturer: LEITNER
4pers. High speed chairlift (detachable) with bubble
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 2124 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
6pers. High speed chairlift (detachable)
100pers. Funifor - wind stable ropeway with wide rope gauge
70pers. Aerial tramway/Reversible ropeway
8pers. Gondola lift (monocable circulating ropeway)
Length: 1890 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Combined installation (6 pers. chair and 8 pers. gondola)
Combined installation (6 pers. chair and 8 pers. gondola)
People mover/Moving Carpet
Length: 87 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
2pers. Chairlift (fixed-grip)
Length: 724 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
80pers. Aerial tramway/Reversible ropeway
Length: 1748 m
Carrying capacity/hour: 800
Manufacturer: Doppelmayr
80pers. Aerial tramway/Reversible ropeway
Length: 2636 m
Carrying capacity/hour: 610
Manufacturer: Doppelmayr
People mover/Moving Carpet
Length: 99 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
People mover/Moving Carpet
Length: 99 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
People mover/Moving Carpet
Length: 69 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
1-14 out of 14 ski resorts